ESC09-00543
| General Inspection | 10/19/2009 | 10/19/2009 | 10/19/2009 2:26:40 PM | P | PART |
|
|
Verbal to RP; Project is not posted, gave blank sign to RP, post by Tuesday 10/20/09. As well, stay on top of reducing trackout from site, if needed install washed rock to reduce to MEP. Will follow up.
|
ESC09-00547
| General Inspection | 10/19/2009 | 10/19/2009 | 10/19/2009 2:24:11 PM | P | CANC |
|
|
wrong inspection.
|