FIR09-00482
| INSP-Supply line flush | 10/16/2009 | 10/19/2009 | 10/19/2009 3:11:32 PM | A | CANC |
|
|
Canceled per Joe until the backflow preventor is removed.
|
FIR09-00482
| INSP-Sprinkler Rough-in/Hydro | 10/16/2009 | 10/19/2009 | 10/19/2009 3:04:22 PM | A | PASS |
|
|
The underground hydro test passed. The amount of water lost was verified ok against the amount allowed in NFPA 13.
|
FIR09-00482
| INSP-Supply line flush | 10/19/2009 | 10/19/2009 | 10/19/2009 10:31:55 AM | P | CANC |
|
|
we would like to follow the previously scheduled hydro with this flush. Phone #: ###-#### Internet Inspection Request from: Scott Carter II Inspection cancelled from web by: Scott Carter II
|
FIR09-00482
| INSP-Sprinkler Rough-in/Hydro | 10/19/2009 | 10/19/2009 | 10/19/2009 10:31:49 AM | P | CANC |
|
|
underground hydro. please call 1 hour prior to inspection. Thank you Phone #: ###-#### Internet Inspection Request from: Michelle Carter Inspection cancelled from web by: Scott Carter II
|