ELE10-01997
| Electrical Rough-In | 10/18/2010 | 10/19/2010 | 10/19/2010 3:17:49 PM | P | PASS |
|
|
Need approval to cover house and art studio. Phone #: ###-#### >> Inspection requested via web by Alan Lusk ok cover house and studio
|
ELE10-01620
| Final | 10/19/2010 | 10/19/2010 | 10/19/2010 2:59:22 PM | P | PASS |
|
|
call for access//George Phone #: ###-#### ok final
|
ELE10-02313
| Permanent Service | 10/19/2010 | 10/19/2010 | 10/19/2010 2:38:52 PM | P | FAIL |
|
|
call John @ ###-#### for lock box code Phone #: ###-#### >> Inspection requested via web by John VanZandt see ele10-02312
|
ELE10-02312
| Permanent Service | 10/19/2010 | 10/19/2010 | 10/19/2010 1:51:08 PM | P | FAIL |
|
|
call for lock box code, John @41-5464 Phone #: ###-#### >> Inspection requested via web by John VanZandt called, no grounding up to code, dryer still 3-wire, strap riser, abrasion protection for gec, fee due
|
ELE10-01651
| Electrical Rough-In | 10/19/2010 | 10/19/2010 | 10/19/2010 12:47:41 PM | P | PASS |
|
|
Eric-Floor heat Phone #: ###-#### checked cable with film, ok cover floor heat
|
ELE10-01354
| Electrical Rough-In | 10/19/2010 | 10/19/2010 | 10/19/2010 11:34:21 AM | P | PASS |
|
|
Nick is the onsite contact and his no. is ###-####. Phone #: ###-#### >> Inspection requested via web by Shawna Gates 5th floor walls and ceilings ok cover
|
ELE10-02305
| Final | 10/18/2010 | 10/19/2010 | 10/19/2010 10:31:59 AM | A | PASS |
|
|
Contact Mike McCurry at ###-####. Phone #: ###-#### >> Inspection requested via web by Tyler Bowen ok final
|
ELE10-02294
| Permanent Service | 10/18/2010 | 10/19/2010 | 10/19/2010 10:14:00 AM | A | PASS |
|
|
michael Phone #: ###-#### p/s o/h rec ok
|
ELE10-02310
| Electrical Rough-In | 10/19/2010 | 10/19/2010 | 10/19/2010 9:47:26 AM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Emmet Bushman walls only ok
|