BLD10-01899
| FIRE-Conference | 10/19/2010 | 10/19/2010 | 10/20/2010 6:03:12 PM | P | DONE |
|
|
On site visit with contractor regarding existing fire alarm notification appliance locations. If the system is modified an FIR permit will be required-see review notes. However, existing coverage appears adequate.
|
BLD10-00842
| FIRE-Sprinkler Rough-in | 10/19/2010 | 10/19/2010 | 10/20/2010 5:55:51 PM | A | PART |
|
|
Overhead fire sprinkler work at the basement and attic/second floor levels okayed for cover as noted on approved plan set.
|
FIR10-00006
| INSP-Conference | 10/19/2010 | 10/19/2010 | 10/20/2010 5:54:33 PM | A | DONE |
|
|
Regarding work in progress and schedule for next site visit and reinspection.
|
BLD10-01120
| FIRE-Conference | 10/19/2010 | 10/19/2010 | 10/20/2010 5:53:44 PM | P | DONE |
|
|
Regarding project completion schedule.
|
FIR10-00497
| INSP-Sprinkler Rough-in | 10/18/2010 | 10/19/2010 | 10/19/2010 12:48:32 PM | A | PART |
|
|
Underground fire supply line approved for bury.
|
BLD10-01899
| FIRE-Sprinkler Rough-in | 10/19/2010 | 10/19/2010 | 10/19/2010 12:47:42 PM | A | PART |
|
|
Overhead fire sprinkler work is approved for cover at the drop ceilings. Noted one upright head covered by foil- to be removed prior to final.
|