FIR11-00689
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 9:34:34 AM | A | PART |
|
|
Final walkthrough completed. Verify conditions per IFC 2009 1803.10.4 at the AE and FE ducts. Plan modifications meet field install.
|
FIR11-00645
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 9:20:29 AM | A | PART |
|
|
Final walkthrough completed acceptable for system 6 included in this permit.
|
FIR11-00431
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 9:02:43 AM | A | PART |
|
|
Re-inspection of previous C/N items.
|
FIR11-00365
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 8:48:47 AM | A | PART |
|
|
Re-inspection for noted C/N items
|
FIR11-00301
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 8:42:26 AM | A | PART |
|
|
Noted overspaced coverage at one location below ductwork at the junction between sub fab systems, provide verification AE and FE ductwork does not require protection per IFC 2009 1803.10.4 (1-3).
|
FIR11-00658
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 7:48:06 AM | A | PASS |
|
|
Previous C/N items finished.
|
FIR11-00524
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 7:32:51 AM | A | PART |
|
|
Field verified corrections.
|
FIR12-00102
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 7:23:15 AM | A | PART |
|
|
Plan modifications field verified to match installation and coverage adjustments.
|
FIR12-00189
| INSP-Final Inspection | 10/17/2012 | 10/19/2012 | 10/30/2012 7:08:06 AM | A | PART |
|
|
Pending coverage below ductwork obstructions.
|
FIR12-00523
| INSP-Alarm Testing | 10/17/2012 | 10/19/2012 | 10/22/2012 2:03:09 PM | P | FAIL |
|
|
Completed initial walkthrough- noted 9 locations in need of revision regarding notification appliances including both first and second floor levels (insp. completed 10/19).
|
FIR12-00451
| INSP-Sprinkler Rough-in/Hydro | 10/19/2012 | 10/19/2012 | 10/22/2012 1:59:17 PM | A | PEND |
|
|
|
BLD12-01193
| FIRE-Final Inspection | 10/15/2012 | 10/19/2012 | 10/22/2012 1:58:41 PM | P | NR |
|
|
|
BLD12-00575
| FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/22/2012 1:58:10 PM | A | PASS |
|
|
Fire life safety inspection passed.
|
BLD12-01055
| FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/22/2012 1:55:04 PM | A | NR |
|
|
Pending project related FIR permit work.
|
FIR12-00314
| INSP-Final Inspection | 10/18/2012 | 10/19/2012 | 10/22/2012 1:53:19 PM | A | FAIL |
|
|
Dry system failed trip testing.
|
FIR12-00602
| INSP-Final Inspection | 10/18/2012 | 10/19/2012 | 10/22/2012 1:51:22 PM | A | FAIL |
|
|
PIV tamper not functional, low air in need of adjustment.
|
BLD11-02484
| FIRE-Final Inspection | 10/16/2012 | 10/19/2012 | 10/19/2012 12:15:26 PM | A | PASS |
|
|
Life safety passed provided door to remain... signage is posted and the manual thumbturn at the main entry/exit is removed. To be verified at structural final per discussion.
|