FIR12-00543
| INSP-Final Inspection | 10/19/2012 | 10/19/2012 | 10/19/2012 3:55:24 PM | P | FAIL |
|
|
Inspection was actually a rough to cover. Sprinkler piping can be covered but the pendant head spacing can not exceed the 130 sq. ft. maximum as per the approved drawings. Revised hydraulic calculations can be submitted to verify a larger spacing or additional pendants added as discussed.
|
MIS12-00290
| FIR-Conference | 10/19/2012 | 10/19/2012 | 10/19/2012 3:47:57 PM | P | DONE |
|
|
The plumbing inspector notified me that what appeared to be an underground supply line was being buried in the same trench as the plumbing pipe he was inspecting and that it was buired too shallow. I went to the job site and found 2" black poly pipe already buried. It was verified that no FIR permit has been applied for this work. A stop work order was posted on site and Tim Frost was notified in plan review. Pictures were taken and emailed to Tim Frost as well of the installed piping.
|
FIR12-00417
| INSP-Sprinkler Rough-in | 10/18/2012 | 10/19/2012 | 10/19/2012 3:27:07 PM | A | FAIL |
|
|
I stopped at the job site and found that the tenting had not been repaired or the batt insulation installed.
|
BLD12-01611
| FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 2:54:34 PM | A | PASS |
|
|
Life safety passed
|
FIR12-00494
| INSP-Sprinkler Rough-in | 10/18/2012 | 10/19/2012 | 10/19/2012 2:32:58 PM | A | PASS |
|
|
See the city approved plans for new locations where sprinkler piping can be covered. I also noted that a new wall located in the dressing room is now blocking a pendant head. It appears one pendant will need to be added and the pendant relocated to be more than 4" from the new wall. Also noted one pendant will be overspaced from the north side of the new entry vestibule when installed. Don and I agreed to add one pendant at this location.
|
BLD12-01368
| FIRE-Final Inspection | 10/19/2012 | 10/19/2012 | 10/19/2012 1:18:35 PM | A | PASS |
|
|
Life safety ok to pass when the project related fire alarm permit is finaled
|
FIR12-00422
| INSP-Final Inspection | 10/19/2012 | 10/19/2012 | 10/19/2012 11:59:37 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00422
| INSP-Sprinkler Rough-in/Hydro | 10/19/2012 | 10/19/2012 | 10/19/2012 11:58:50 AM | A | PASS |
|
|
Permit finaled
|
FIR12-00372
| INSP-Alarm Testing | 10/16/2012 | 10/19/2012 | 10/19/2012 11:57:54 AM | A | FAIL |
|
|
See todays entry
|
FIR12-00372
| INSP-Alarm Testing | 10/16/2012 | 10/19/2012 | 10/19/2012 11:57:10 AM | A | FAIL |
|
|
See todays entry
|
FIR12-00372
| INSP-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 11:52:48 AM | A | FAIL |
|
|
This was an early morning after hours inspection. No testing was actually performed due to most of the strobes were overspaced/wrong candella. By the time the changes were made we were outside the window of testing. Rita was contacted for overtime billing.
|
BLD12-02765
| FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 11:05:36 AM | A | FAIL |
|
|
Repair the emergency lights as discussed in both the main sales area and the stockroom, remove the bar/deadbolt from the rear exit door, provide for annual inspection of the existing fire sprinkler system. Fire extinguishers are going to be mounted by SimplexGrinnell.
|
BLD12-02678
| FIRE-Final Inspection | 10/18/2012 | 10/19/2012 | 10/19/2012 11:03:35 AM | A | FAIL |
|
|
Provide panic hardware on the main exit as per the approved plans, repair all exit/emergency lights, one of the bounce houses is blocking upright sprinkler coverage and is not maintaining the minimum 18" clearance below the sprinklers, per scott arellano the second fully enclosed bounce house is ok not to be provided interior sprinkler coverage, provide occupant load sign for "186", provide single action hardware for the office door as discussed, provide verification of annual inspection for the existing fire sprinkler system.
|