ELE16-03065
| Final | 10/19/2016 | 10/19/2016 | 10/19/2016 1:23:06 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by Kurt Carlson Not ready, discussed all LV boxes shall be closed for electrical final. Also discussed no GFCI protection for sump pump under sink nor Micro, not considered a kitchen since there is no 240v recept installed
|
ELE16-02600
| Electrical Rough-In | 10/18/2016 | 10/19/2016 | 10/19/2016 12:25:28 PM | A | PASS |
|
|
Dave. Phone #: ###-#### Inspection requested via web by Sean DeLacy 6th floor hard lids and 4th floor rooms as noted ok cover
|
ELE16-03144
| Final | 10/18/2016 | 10/19/2016 | 10/19/2016 10:55:17 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Louis Keller Final ok
|
ELE13-00256
| Final | 10/18/2016 | 10/19/2016 | 10/19/2016 10:45:51 AM | A | FAIL |
|
|
Ryan-call for access Phone #: ###-#### 210.8 GFCI shall be located in readily accessible location (gate will be changed to swing opposite direction so it wont hit meter)
|
ELE16-03023
| Final | 10/19/2016 | 10/19/2016 | 10/19/2016 10:26:58 AM | A | FAIL |
|
|
Partial final Phone #: ###-#### Inspection requested via web by Bud Medcoff 210.8 all 120v receptacles in a commercial kitchen shall have GFCI protection 408.4 Field Identification required 760.121(b) Fire alarm circuit shall be labeled in red indification letters or mark OCPD (contractor stated all exterior soffit lights will be removed)
|
ELE15-03995
| Final | 10/17/2016 | 10/19/2016 | 10/19/2016 9:57:45 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Noeker Sign final ok
|