PLM00-02169
| Roof Drains | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 15:44:00. Contact: ###-####. regrade roof drain and overflow lines. 10/2/2000 9:06:42 AM
|
PLM00-02912
| Plumbing Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 07:21:54. Contact: ###-####. partial gw ok kitchen area 10/2/2000 6:08:59 PM
|