BLD00-01426
| BLD-Framing/Rough-in | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PART |
|
|
no inspection of rated wall 10/2/2000 12:09:59 PM
|
BLD00-02838
| BLD-Footing | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | FAIL |
|
|
poured 10/2/2000 12:09:19 PM
|
BLD00-01349
| BLD-Final | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PASS |
|
|
c/c#19837 10/2/2000 12:09:01 PM
|
MEC00-03285
| Final | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | NR |
|
|
gas test and a final Todd ###-####
|
MEC00-03285
| Pressure Test | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | FAIL |
|
|
todd see final for #
|
MEC00-02038
| Final | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 10:32:08. Contact: ###-####.
|
MEC00-03337
| Rough-in | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2000 at 11:06:20. Contact: ###-####.
|
MEC00-03341
| Pressure Test | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PASS |
|
|
gas test Northwest animal hosp. amanda ###-####
|