Inspections for the day of: Monday, October 2, 2000.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMarv Burrus
TitleELE
Phone #340-1297
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-03659 Final9/29/200010/2/200010/2/2000 12:00:00 AMAPASS
###-####. 2-sub-panels, storeage room r/i. 10/2/2000 10:11:31 PM
ELE00-02985 Electrical Rough-In9/29/200010/2/200010/2/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/29/2000 at 16:46:34. Contact: ###-####. confrerence; u.p.s. clearances. 10/2/2000 10:12:33 PM
ELE00-03647 Permanent Service10/2/200010/2/200010/2/2000 12:00:00 AMAPASS
main service switch-gear. ok 10/2/2000 10:16:14 PM
ELE00-03648 Electrical Rough-In10/2/200010/2/200010/2/2000 12:00:00 AMAPASS
Added by Inspector: 403 On 10/2/2000 tri-plex: left-end unit was sheetrocked, unable to inspect raceway; middle unit was insulated, inspected areas visable. right-side unit inspected by jray. inspection doesn't include meter/main service gear. inspected as per jschmer.
ELE00-03837 Electrical Rough-In10/2/200010/2/200010/2/2000 12:00:00 AMPPASS
chad 2 rooms ###-####. ele r/i; remodel at rear of building. 10/2/2000 10:26:10 PM
ELE00-03152 Final10/2/200010/2/200010/2/2000 12:00:00 AMPFAIL
todd ###-#### 3rd floor. nec: 370-20. boxes shall be flush with combustable material. posted. left message on answer machine. 10/2/2000 10:25:03 PM
ELE00-00909 Electrical Rough-In10/2/200010/2/200010/2/2000 12:00:00 AMPPART
potting inspection bernice ###-####. pool light fixture; potting. 10/2/2000 10:20:23 PM
ELE00-03834 Temporary Service10/2/200010/2/200010/2/2000 12:00:00 AMPFAIL
right hand side of road ###-####. grounding electrode connection not completed, informed contractor. 10/2/2000 10:19:12 PM
ELE00-03795 Electrical Rough-In10/2/200010/2/200010/2/2000 12:00:00 AMPPART
2ND FLOOR\\###-####. west-end walls r/i. 10/2/2000 10:23:49 PM