ELE00-03659
| Final | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PASS |
|
|
###-####. 2-sub-panels, storeage room r/i. 10/2/2000 10:11:31 PM
|
ELE00-02985
| Electrical Rough-In | 9/29/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/29/2000 at 16:46:34. Contact: ###-####. confrerence; u.p.s. clearances. 10/2/2000 10:12:33 PM
|
ELE00-03647
| Permanent Service | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PASS |
|
|
main service switch-gear. ok 10/2/2000 10:16:14 PM
|
ELE00-03648
| Electrical Rough-In | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 403 On 10/2/2000 tri-plex: left-end unit was sheetrocked, unable to inspect raceway; middle unit was insulated, inspected areas visable. right-side unit inspected by jray. inspection doesn't include meter/main service gear. inspected as per jschmer.
|
ELE00-03837
| Electrical Rough-In | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PASS |
|
|
chad 2 rooms ###-####. ele r/i; remodel at rear of building. 10/2/2000 10:26:10 PM
|
ELE00-03152
| Final | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | FAIL |
|
|
todd ###-#### 3rd floor. nec: 370-20. boxes shall be flush with combustable material. posted. left message on answer machine. 10/2/2000 10:25:03 PM
|
ELE00-00909
| Electrical Rough-In | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PART |
|
|
potting inspection bernice ###-####. pool light fixture; potting. 10/2/2000 10:20:23 PM
|
ELE00-03834
| Temporary Service | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | FAIL |
|
|
right hand side of road ###-####. grounding electrode connection not completed, informed contractor. 10/2/2000 10:19:12 PM
|
ELE00-03795
| Electrical Rough-In | 10/2/2000 | 10/2/2000 | 10/2/2000 12:00:00 AM | P | PART |
|
|
2ND FLOOR\\###-####. west-end walls r/i. 10/2/2000 10:23:49 PM
|