Inspections for the day of: Tuesday, October 2, 2001.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01349 BLD-Aging Inspection10/2/200110/2/200110/5/2001 12:00:00 AM NR
met owner at site 10/5/2001 11:43:08 AM
BLD01-00228 BLD-Aging Inspection10/2/200110/2/200110/2/2001 12:00:00 AM NR
wip for overall project 10/2/2001 2:52:36 PM
BLD01-00701 BLD-Aging Inspection10/2/200110/2/200110/2/2001 12:00:00 AM PASS
shows prior Pass 10/2/2001 9:08:05 AM
MEC01-01125 Final10/2/200110/2/200110/2/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 10/2/2001 9:06:57 AM shows prior "pass".
BLD01-01795 BLD-Final10/1/200110/2/200110/2/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/01/2001 at 08:50:55. Contact: ###-####.
BLD01-00009 BLD-Final10/1/200110/2/200110/2/2001 12:00:00 AMAPASS
###-#### no card, looks ok 10/2/2001 11:01:43 AM
BLD01-02028 BLD-Framing/Rough-in10/1/200110/2/200110/2/2001 12:00:00 AMAPART
###-#### JIM met w/ bldr at site; obtain other r/is...has prior shell permit bld01-00917 w/ no insps??? 10/2/2001 12:20:05 PM
BLD01-01205 BLD-Framing/Rough-in10/1/200110/2/200110/2/2001 12:00:00 AMAFAIL
###-#### KELLY c/n, unable to verify truss/girder conections as all ready insulated, complete air seal. 10/2/2001 4:09:03 PM
MIS01-00195 BLD-Conference10/1/200110/2/200110/2/2001 12:00:00 AMAPASS
###-#### CALL BEFORE GOING PUT MARK
BLD01-00531 BLD-Energy code compliance10/1/200110/2/200110/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/01/2001 at 19:00:05. Contact: ###-####. 2nd fl. sec 1...complete firestops at plbg, elec per listing...recall 10/2/2001 10:58:37 AM
BLD00-01649 BLD-Framing/Rough-in10/2/200110/2/200110/2/2001 12:00:00 AMPPART
###-#### mel horiz.exit wall firestops not complete 10/3/2001 5:50:53 PM
BLD01-00673 BLD-Final10/2/200110/2/200110/2/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/02/2001 at 09:11:14. Contact: ###-####. c/n ok. 10/2/2001 4:09:46 PM
BLD01-02239 BLD-Foundation10/2/200110/2/200110/2/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/02/2001 at 09:47:43. Contact: ###-####. work poured w/o insp, holdowns not correct ( dont match ) 10/2/2001 3:07:02 PM
BLD01-00531 BLD-Energy code compliance10/2/200110/2/200110/2/2001 12:00:00 AMPNR
scott ###-#### energy code ... fix plbg firestops. 10/2/2001 4:42:51 PM
BLD01-01960 BLD-Framing/Rough-in10/2/200110/2/200110/2/2001 12:00:00 AMPPART
r/i dave ###-#### int wall ok pend elec 10/2/2001 2:53:00 PM
BLD01-00917 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 10/2/2001 12:21:49 PM left c/n re lack of insps...need engs ok for struct work. forwarded thru Id. Comm'l const to arch.
MIS01-00195 BLD-Final10/2/200110/2/200110/2/2001 12:00:00 AMPPART
Added by Inspector: 340 On 10/2/2001 2:34:30 PM seal/ block upper floor ext door, add extinguisher.
BLD01-01796 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 10/2/2001 2:37:43 PM c/n issued : complete work per plan...may expire
BLD01-01797 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPPART
Added by Inspector: 340 On 10/2/2001 2:38:27 PM c/n issued, complete work or may expire
BLD01-00228 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 10/2/2001 2:51:50 PM w/ Kelly, supt at site...permit #s may be confused...c/n issued w/bld00-02394
re framing, firestops, etc.
BLD01-01349 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 10/2/2001 3:00:38 PM re obtaining final
BLD01-02523 BLD-Conference10/2/200110/2/200110/2/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 10/2/2001 4:27:16 PM w/ JR ...pins in, setback appears ok, install steel as shown, recall when ready.