BLD01-01814
| BLD-Energy code compliance | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | A | PART |
|
|
terry- ###-#### energy code ok to cover-need to provide an energy report prior to issuance of c. of c. at final. 10/2/2001 9:09:19 AM
|
BLD01-02044
| BLD-Framing/Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | A | PASS |
|
|
shear --###-####- jay ok to side--c/n posted indicating an address is required on building per condition of permit. 10/2/2001 9:22:25 AM
|
BLD01-01152
| BLD-Concrete | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | A | PART |
|
|
###-#### ed \\special insp
|
MEC01-01868
| Final | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/01/2001 at 17:17:58. Contact: ###-####.
|
BLD01-02026
| BLD-Framing/Rough-in | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Mike c/n posted on site. 10/2/2001 9:07:53 AM
|
BLD01-02307
| BLD-Final | 10/1/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | P | PASS |
|
|
fn dave--- ###-#### All required sign offs completed--everything looks ok. 10/2/2001 2:39:07 PM
|
BLD01-01683
| BLD-Energy code compliance | 10/2/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 07:22:35. Contact: ###-####. ok to cover 10/2/2001 12:48:43 PM
|
BLD01-02077
| BLD-Wall cover | 10/2/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 08:59:38. Contact: ###-####. ok to side 10/2/2001 1:34:12 PM
|
BLD01-02388
| BLD-Framing/Rough-in | 10/2/2001 | 10/2/2001 | 10/2/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/02/2001 at 10:06:40. Contact: ###-####. c/n issued--ok to insulate 10/2/2001 2:07:40 PM
|