Inspections for the day of: Wednesday, October 2, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-03007 Groundwork10/1/200210/2/200210/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/01/2002 at 15:11:56. Contact: ###-####.
PLM02-03010 Final10/1/200210/2/200210/2/2002 12:00:00 AMAPASS
###-####
PLM02-03003 Water and/or Sewer10/1/200210/2/200210/2/2002 12:00:00 AMAPASS
###-#### inspection for water line replacment only 10/2/2002 1:46:18 PM
PLM02-02343 Plumbing Rough-in10/1/200210/2/200210/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/01/2002 at 14:53:08. Contact: ###-####.
PLM02-03016 Plumbing Rough-in10/2/200210/2/200210/2/2002 12:00:00 AMPNR
###-####
PLM02-02490 Final10/2/200210/2/200210/2/2002 12:00:00 AMPPART
###-#### upc 101.5.2 health and safety condition (1) replace or repair mop sink faucet (2) remove or provide separate water supply for soap dispencer (3) unclog floor drain by water heater oked temp.occ. 10/2/2002 4:47:30 PM
PLM02-03014 Sprinkler (Final)10/2/200210/2/200210/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/02/2002 at 09:51:24. Contact: ###-####.
PLM02-02220 Roof Drains10/2/200210/2/200210/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/02/2002 at 10:47:22. Contact: ###-####.
PLM02-02748 Final10/2/200210/2/200210/2/2002 12:00:00 AMPPASS
contact pager ###-#### niki; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
PLM02-03016 Groundwork10/2/200210/2/200210/2/2002 12:00:00 AMPPASS