BLD03-01610
| BLD-Aging Inspection | 10/2/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | | CANC |
|
|
|
BLD03-01566
| BLD-Framing/Rough-in | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 7:05:13 PM. Contact: ###-####.
|
BLD03-01344
| BLD-Foundation | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | A | PART |
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-00563
| BLD-Wall cover | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 2:43:32 PM. Contact: ###-####.
|
MEC03-02696
| Pressure Test | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | A | PASS |
|
|
Late Am please....###-#### jason
|
BLD03-01566
| BLD-Framing/Rough-in | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | A | FAIL |
|
|
rear wall from bay window to garage needs nails and new enginering sheet for changes addl sq was added. front wall of home and left and right walls ok only, contractor greg on site will recall. 10/1/2003 7:48:35 PM
|
BLD03-01833
| BLD-Final | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
|
BLD03-01833
| BLD-Final | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/1/2003 at 3:51:13 PM. Contact: ###-####.
|
BLD03-02367
| BLD-Conference | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | PART |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Annette Moore. looked at work same as some one prior still needes alllrough in , did note stair head height. 10/1/2003 11:33:16 PM
|
MIS03-00167
| BLD-Final | 10/1/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | PASS |
|
|
###-#### ok oc. 10/1/2003 11:31:11 PM
|
BLD03-00973
| BLD-Energy code compliance | 10/2/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | FAIL |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Annette Moore insulated ok, but no vapor barrier in place, i called Gale insulation and told them to provide verification of vapor barrier not required, also call an 800 number listed on insulation but no one available to talk with, also called Ingo strupe with the State of Idaho Energy division and left message to call me , to see if he could know this. I posted a c/n to verify that it would not be required. contractors worker on site also notified. edaai9ikle 10/1/2003 10:06:55 PM
|
BLD03-01646
| BLD-Final | 10/2/2003 | 10/2/2003 | 10/2/2003 12:00:00 AM | P | PASS |
|
|
anthony; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|