Inspections for the day of: Monday, October 2, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00528 FIRE-Final Inspection10/2/200610/2/200610/2/2006 4:10:03 PMPPASS
Life safety finaled
FIR06-00409 INSP-Sprinkler Rough-in/Hydro10/2/200610/2/200610/2/2006 3:56:31 PMPPART
Rough-in passed but the overhead hydro test failed.
FIR05-00536 INSP-Sprinkler Rough-in10/2/200610/2/200610/2/2006 3:47:17 PMPFAIL
Inspected east area of the first floor. Ok to cover when the fire alarm wire has been removed from the sprinkler piping.
FIR06-00685 INSP-Sprinkler Rough-in10/2/200610/2/200610/2/2006 2:51:13 PMPPASS
Sprinkler piping above the ceilings is ok to cover.
FIR06-00137 INSP-Sprinkler Rough-in/Hydro10/2/200610/2/200610/2/2006 2:50:18 PMPFAIL
Overhead and underground hydro test failed
BLD05-00200 FIRE-Final Inspection9/29/200610/2/200610/2/2006 11:51:47 AMAFAIL
No approved plans on site. I went over other defiencies like the smoke alarms and the fire extinguishers.
BLD06-01741 FIRE-Final Inspection9/29/200610/2/200610/2/2006 9:54:21 AMAFAIL
Need ceiling tile installed and the fire sprinkler permit finaled first. When that is done life safety can be finaled