MEC07-03314
| Final | 9/27/2007 | 10/2/2007 | 10/2/2007 3:37:36 PM | P | PASS |
|
|
Pls call 1/2 hr prior to inspection. Thanks. Phone #: ###-#### Internet Inspection Request from: loretta barck
|
MEC07-03182
| Rough-in | 10/1/2007 | 10/2/2007 | 10/2/2007 10:54:42 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims see the other inspection request for corrections.
|
MEC07-03182
| Pressure Test | 10/1/2007 | 10/2/2007 | 10/2/2007 10:53:35 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: April Sims 20# test ok needs an insulation shield at the b-vent, complete framing at the b-vent. install bath fans to the ducting. needs a fireplace permit and inspection after the framing is complete.
|
MEC07-02294
| Conference | 10/1/2007 | 10/2/2007 | 10/2/2007 10:04:06 AM | A | PASS |
|
|
Englefield Green 2/3 access code 0203 Phone #: ###-#### Internet Inspection Request from: Doramus Cassi
|
MEC07-02295
| Final | 10/1/2007 | 10/2/2007 | 10/2/2007 10:03:48 AM | A | PASS |
|
|
Englefield Green 1/3 access code 0103 Phone #: ###-#### Internet Inspection Request from: Doramus Cassi
|
MEC07-02701
| Pressure Test | 10/1/2007 | 10/2/2007 | 10/2/2007 9:36:01 AM | A | PASS |
|
|
Please call John with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel 20# test 1 1/2" gas line to two boilers ok.
|
MEC07-03396
| Final | 10/1/2007 | 10/2/2007 | 10/2/2007 8:54:28 AM | A | NH |
|
|
Please contact Justin Kaserman for access. Thank you. Phone #: ###-#### Internet Inspection Request from: Roger Patterson no access today will call when ready.
|
MEC07-03370
| Pressure Test | 10/1/2007 | 10/2/2007 | 10/2/2007 8:50:36 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/1/2007 at 2:19:22 PM. Contact: ###-####. ri 20# test ok
|
MEC07-03370
| Rough-in | 10/1/2007 | 10/2/2007 | 10/2/2007 8:50:07 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/1/2007 at 2:19:00 PM. Contact: ###-####. ri 20# test ok
|