BLD08-00777
| BLD-Conference | 10/2/2008 | 10/2/2008 | 10/2/2008 6:04:09 PM | P | CANC |
|
|
Re-scheduled for 10/3
|
BLD07-03229
| BLD-Other | 10/2/2008 | 10/2/2008 | 10/2/2008 6:03:30 PM | P | DONE |
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 10:13:26 AM. Contact: ###-####. Grid ok
|
BLD08-00523
| BLD-Final | 10/2/2008 | 10/2/2008 | 10/2/2008 3:26:10 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 7:23:51 AM. Contact: ###-####. OK for Perm occ.
|
BLD08-01940
| BLD-Final | 10/1/2008 | 10/2/2008 | 10/2/2008 3:23:44 PM | P | PASS |
|
|
Matt Phone #: ###-#### OK for Perm Occ.
|
ESC08-00800
| Site Preparation | 10/2/2008 | 10/2/2008 | 10/2/2008 2:17:05 PM | P | PASS |
|
|
|
BLD08-02005
| BLD-Footing | 10/2/2008 | 10/2/2008 | 10/2/2008 2:16:43 PM | P | PASS |
|
|
adam Phone #: ###-#### Note: Concrete Contr Mentioned that Greenhouse walls may be of Foam block construction.........Advised Contractor to contact PDS dept for info on requirements for installing foam block.
|
BLD08-01700
| BLD-Framing/Rough-in | 10/2/2008 | 10/2/2008 | 10/2/2008 1:43:07 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/2/2008 at 7:55:27 AM. Contact: ###-####.
|
BLD06-02323
| BLD-Framing/Rough-in | 10/1/2008 | 10/2/2008 | 10/2/2008 11:15:47 AM | A | PART |
|
|
Inspect 4th floor, 3rd floor and misc mechanical rooms. Phone #: ###-#### Internet Inspection Request from: Bob Thornton OK to cover....Lounge Ceiling, all Mech Rooms (1 side), 3rd and 4th floors.
|