Inspections for the day of: Thursday, October 2, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01882 FIRE-Final Inspection10/1/200810/2/200810/2/2008 3:38:00 PMAPASS
LIfe safety passed.
BLD08-01200 FIRE-Final Inspection10/1/200810/2/200810/2/2008 3:37:36 PMAPASS
LIfe safety passed.
FIR08-00299 INSP-Sprinkler Rough-in/Hydro10/1/200810/2/200810/2/2008 3:37:12 PMAPASS
24 hour air test passed for both systems
FIR08-00538 INSP-Final Inspection10/1/200810/2/200810/2/2008 11:38:16 AMAFAIL
No testing performed. A single strobe needs to be relocated in the west corridor so that it is within 15' or either end. Candella settings and spacing appeared ok.
BLD08-01940 FIRE-Final Inspection10/1/200810/2/200810/2/2008 11:36:48 AMAPASS
Fire life safety passed.
FIR08-00493 INSP-Final Inspection10/1/200810/2/200810/2/2008 11:35:37 AMAPASS
Permit finaled
BLD08-01917 FIRE-Final Inspection10/1/200810/2/200810/2/2008 11:34:58 AMAPASS
Fire life safety passed
BLD08-01703 FIRE-Final Inspection10/2/200810/2/200810/2/2008 11:34:28 AMPPASS
LIfe safety passed
FIR08-00586 INSP-Final Inspection10/1/200810/2/200810/2/2008 11:33:57 AMAPASS
Permit finaled