Inspections for the day of: Thursday, October 2, 2008.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01882 BLD-Final10/2/200810/2/200810/2/2008 4:21:38 PMPPASS
kevin Phone #: ###-####
BLD08-01882 DOC - Permit Finaled10/2/200810/2/200810/2/2008 4:21:32 PMPPASS
Verified all signatures. Letter of compliance issued.
BLD08-01601 BLD-Framing/Rough-in10/2/200810/2/200810/2/2008 3:36:15 PMPNR
Walter Phone #: ###-####. Needs to provide approved plans and truss engineering. Also needs to complete the air seal package.
ESC08-00653 Random Inspection10/2/200810/2/200810/2/2008 3:35:20 PMPPASS
BLD08-00732 BLD-Final10/2/200810/2/200810/2/2008 3:19:33 PMPNR
JASON Phone #: ###-####. Needs mech ri insp. Called Jason and left message.
BLD08-01917 BLD-Final10/1/200810/2/200810/2/2008 1:55:49 PMPFAIL
Matt Phone #: ###-####. Needs ada compliant bench in changing room and procide panic hardware on two of the three entry doors.
BLD08-00777 BLD-Final10/2/200810/2/200810/2/2008 1:54:41 PMPNR
Scheduled by a contractor via Hello! on 10/2/2008 at 11:02:22 AM. Contact: ###-####. Needs elec. and zoning.
ESC07-01257 Random Inspection10/2/200810/2/200810/2/2008 1:54:16 PMPPASS
BLD07-02603 BLD-Framing/Rough-in10/2/200810/2/200810/2/2008 1:54:07 PMPPASS
diane Phone #: ###-####
ESC08-00208 Site Final10/2/200810/2/200810/2/2008 10:10:39 AMAPASS
Landscaping completed. 70% reveg has been exceeded. ok.
ESC08-00113 Site Final10/2/200810/2/200810/2/2008 9:40:00 AMAPASS
All landscaping completed. 70 % reveg has been exceeded.
BLD07-02700 BLD-Other10/1/200810/2/200810/2/2008 9:23:27 AMAPART
kent - handrail Phone #: ###-####. handrails height ok. Still working on two sections. Also got testing results for impact loads on glass and handrails. ok.