ESC09-00584
| General Inspection | 10/2/2009 | 10/2/2009 | 10/2/2009 4:32:05 PM | P | PASS |
|
|
Tony phone
|
BLD09-01595
| BLD-Concrete | 10/2/2009 | 10/2/2009 | 10/2/2009 4:23:08 PM | P | PART |
|
|
Tony ###-#### Select walls OK
|
BLD09-01446
| BLD-Framing/Rough-in | 10/2/2009 | 10/2/2009 | 10/2/2009 4:21:28 PM | P | FAIL |
|
|
DAVID Phone #: ###-#### C/N ....truss corrections posted on site.
|
BLD09-01078
| BLD-Conference | 10/2/2009 | 10/2/2009 | 10/2/2009 4:20:11 PM | P | DONE |
|
|
she doesnt know what kind insp. she wants//Alice ###-#### Walk thru Frame.
|
BLD09-00723
| BLD-Final | 10/2/2009 | 10/2/2009 | 10/2/2009 11:18:47 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/2/2009 at 7:06:21 AM. Contact: ###-####. C/C issued
|
BLD09-00723
| DOC - Permit Finaled | 10/2/2009 | 10/2/2009 | 10/2/2009 11:18:23 AM | P | PASS |
|
|
|
BLD09-01595
| BLD-Concrete | 10/1/2009 | 10/2/2009 | 10/2/2009 10:59:48 AM | A | CANC |
|
|
Tony Phone #: ###-#### Re- sched......
|
MIS09-00180
| BLD-Conference | 10/1/2009 | 10/2/2009 | 10/2/2009 10:11:07 AM | A | NR |
|
|
|
BLD09-01025
| BLD-Final | 10/1/2009 | 10/2/2009 | 10/2/2009 10:08:19 AM | A | PASS |
|
|
Marvin phone.............OK for Perm Occ.
|
ESC09-00572
| General Inspection | 10/1/2009 | 10/2/2009 | 10/2/2009 10:07:48 AM | A | PASS |
|
|
OK
|
BLD09-00461
| BLD-Framing/Rough-in | 10/1/2009 | 10/2/2009 | 10/2/2009 10:06:52 AM | A | PASS |
|
|
Frame and energy OK for core and South wing.
|
MIS09-00180
| Set Bond Amount | 10/1/2009 | 10/2/2009 | 10/1/2009 2:17:15 PM | A | DONE |
|
|
This is for a home purchase. Please contact Kori at the number provided at least 1/2 hour before arriving to get access. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer C/N.......Need Smoke Det in all sleeping rooms and hallway adjacent to sleeping rooms. Need GFCI in bathrms and Kitchen.......or verify that those outlets are protected.
|