Inspections for the day of: Friday, October 2, 2009.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00600 Site Preparation10/2/200910/2/200910/2/2009 3:15:33 PM NR
ESC09-00507 Site Preparation10/1/200910/2/200910/2/2009 2:43:35 PMPPART
All Bmp's are installed for the upcoming storm event. Will re-inspect on 10/5/09 to see how all BMP's have held up to the storm event.
ESC09-00575 General Inspection10/1/200910/2/200910/2/2009 2:08:32 PMPPASS
ESC09-00581 Site Preparation10/2/200910/2/200910/2/2009 1:34:15 PM PASS
ESC09-00523 Tracking Control9/30/200910/2/200910/2/2009 11:18:44 AMAPASS
ESC09-00467 Tracking Control9/30/200910/2/200910/2/2009 11:18:27 AMAPASS
ESC09-00468 Tracking Control9/30/200910/2/200910/2/2009 11:18:03 AMAPASS
ESC09-00577 Site Preparation10/2/200910/2/200910/2/2009 9:09:01 AM PART
Verbal to RP:
Install external protection on all storm drains within the area of impact from the project. Update with the city on cootact information and the ESC sign. Will re-inspect on 10/5/09am.
ESC09-00551 Site Preparation10/2/200910/2/200910/2/2009 8:12:29 AM NR