Inspections for the day of: Tuesday, October 2, 2012.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00445 INSP-Conference10/1/201210/2/201210/3/2012 3:18:23 PMPDONE
On site conference with sub and general contractors regarding BLD fire code review note #17 and requirements per IFC 2009 sec. 904.11.1 regarding manual pull locations. Design locations appear to meet min. code requirements.
FIR12-00198 FIR-Aging Inspection10/2/201210/2/201210/3/2012 7:33:50 AM DONE
Inspection scheduled 10/3.
FIR12-00509 INSP-Sprinkler Rough-in10/2/201210/2/201210/3/2012 7:26:58 AMPPART
Noted items completed. Overhead work approved for ceiling cover.
BLD12-02117 FIRE-Final Inspection10/1/201210/2/201210/3/2012 7:25:56 AMAPASS
BLD12-02351 FIRE-Final Inspection10/1/201210/2/201210/3/2012 7:25:35 AMAPASS
BLD12-02350 FIRE-Final Inspection10/1/201210/2/201210/3/2012 7:25:13 AMAPASS
BLD12-02116 FIRE-Final Inspection10/1/201210/2/201210/3/2012 7:24:52 AMAPASS
BLD12-00581 FIRE-Final Inspection10/2/201210/2/201210/2/2012 4:47:31 PMPPASS
Scope of work completed. Life safety inspection passed.
FIR12-00108 INSP-Sprinkler Rough-in10/2/201210/2/201210/2/2012 4:43:44 PMAPART
Okay to cover fire sprinkler work at the 3rd floor conference room 306.