Inspections for the day of: Thursday, October 2, 2014.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00193 General Inspection10/2/201410/2/201410/2/2014 2:50:28 PM PASS
see final
ESC14-00193 DOC - Permit Finaled10/2/201410/2/201410/2/2014 2:50:11 PMPPASS
This portion of the project is complete. The City decided to cancel the rest of the project due to multiple other projects occuring in a small area. RP stated the rest of the work will be bid out again, with new permits.
no esc issues with the portion that's completed
ESC14-00546 General Inspection10/2/201410/2/201410/2/2014 2:07:24 PM PART
No issues on current parcel/project. Although concrete that's been washed out on the down hill lot from site, still hasn't been cleanup. that needs to be done prior to next inspection or SWO shall be issued
ESC14-00548 General Inspection10/2/201410/2/201410/2/2014 1:55:39 PM PASS
WIP
No ESC Issues at this time
permit posted
ESC14-00771 Site Preparation10/1/201410/2/201410/2/2014 10:00:17 AMAPASS
Ken Phone #: ###-####
Permit Posted next to Construction Entrance. Lined Concrete Washout installed along with perimeter BMP's installed. Drop Inlet located below site is also protected with a witches hat.
Good looking Site. lot is flat for a Hillside lot
ESC14-00544 General Inspection10/2/201410/2/201410/2/2014 9:09:42 AM PASS
No esc issues at this time