ELE13-00120
| ELE-Aging Inspection | 10/2/2018 | 10/2/2018 | 10/10/2018 7:48:54 AM | | FAIL |
|
|
still has parcel hold
|
ELE18-01526
| Final | 9/30/2018 | 10/2/2018 | 10/2/2018 2:13:22 PM | P | PASS |
|
|
code1830 Phone #: ###-#### Inspection requested via web by Neal Rumsey Final ok
|
ELE18-03773
| Electrical Rough-In | 10/2/2018 | 10/2/2018 | 10/2/2018 1:17:52 PM | P | PASS |
|
|
Underground Phone #: ###-#### Inspection requested via web by Zane Robertson Underground in kitchen area ok to cover
|
ELE18-03761
| Temporary Service | 10/2/2018 | 10/2/2018 | 10/2/2018 1:17:17 PM | P | PASS |
|
|
Temp power Phone #: ###-#### Inspection requested via web by Zane Robertson t/s u/g n ok
|
ELE18-03244
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 12:38:39 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Connectors and Cupplings Shall be made wrench tight. (All Compression raintight fittings)
|
ELE18-03244
| Electrical Rough-In | 10/2/2018 | 10/2/2018 | 10/2/2018 12:38:31 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Listing only ok
|
ELE18-03768
| Electrical Rough-In | 10/2/2018 | 10/2/2018 | 10/2/2018 12:24:24 PM | P | PASS |
|
|
David Joseph ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg 210.70A3. Attics used for storage shall have light controlled by a switch.(needed before final) 2 bedroom extension ok to cover.
|
ELE18-03745
| Rough-In Permanent Service | 10/2/2018 | 10/2/2018 | 10/2/2018 11:32:27 AM | P | PASS |
|
|
Call with any questions, thank you. Phone #: ###-#### Inspection requested via web by kim grundhauser rough in ok p/s u/g n okl
|
ELE18-02910
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 11:21:38 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz Final ok
|
ELE18-02747
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:48:40 AM | A | PASS |
|
|
This is the one I sent you a picture of the installed vanity light. Phone #: ###-#### Inspection requested via web by Craig Korell Final ok
|
ELE18-03762
| Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/2/2018 10:48:18 AM | A | PASS |
|
|
New wall rough-in switch and power Phone #: ###-#### Inspection requested via web by David Feller Reception and waiting areas only ok to cover
|
ELE17-00480
| Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/2/2018 10:26:05 AM | A | FAIL |
|
|
Rough in Garage and underground Phone #: ###-#### Inspection requested via web by Don Conley Voicemail full. Unable to leave message. underground ok to cover 210.11C4. At least 1 20A circuit shall supply receps in all Attached and detached Garages. Circuit shall have no others.
|
ELE18-03743
| Rough-In Permanent Service | 10/1/2018 | 10/2/2018 | 10/2/2018 10:01:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin blackmon Rough in ok p/s u/g n ok
|
ELE18-01107
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 9:20:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Eric Schroeder Can lights only Final ok
|