MEC18-04692
| Final | 9/27/2018 | 10/2/2018 | 10/2/2018 4:00:09 PM | P | PASS |
|
|
INSTALLER DAVID ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace co ok
|
MEC18-03509
| Final | 9/27/2018 | 10/2/2018 | 10/2/2018 3:40:53 PM | P | PASS |
|
|
Please call Rachel in route to inspection ###-#### Phone #: ###-#### Inspection requested via web by Justin Osterhout- furnace a/c coil co ok
|
MEC18-04724
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 3:18:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace co ok
|
MEC18-04535
| Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 2:52:57 PM | P | PASS |
|
|
high pressure gas test. Phone #: ###-#### Inspection requested via web by Aaron Alandt- 60lb gas pass existing system- tagged meter- need to verify if CO detectors are installed before final
|
MEC18-04745
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 2:29:37 PM | P | PASS |
|
|
Wold like PM and call on way thank you. Phone #: ###-#### Inspection requested via web by Xanti Berria- furnace a/c coil co ok
|
MEC18-04528
| Pressure Test | 10/2/2018 | 10/2/2018 | 10/2/2018 2:22:32 PM | P | PART |
|
|
Pressure Test Witness - If questions call Ryan @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 60lb gas pass lab area wall up into ceiling- will test whole system when installed- ok to cover lab walls
|
MEC18-03629
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 2:03:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
MEC18-03630
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 2:02:55 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Randy Hart
|
MEC18-04700
| Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 1:32:40 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace and HVAC R/I ok
|
MEC18-04700
| Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 1:32:10 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
MEC18-04730
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 11:25:42 AM | A | PASS |
|
|
PLEASE CALL (HOMEOWNER) MICHELLE @ # LISTED WHEN EN ROUTE. CUST PREFERS BETWEEN 10 A.M. - 12 P.M. TIME FRAME--WILL NOT ANSWER DOOR BEFORE 10 A.M.! Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING- furnace co ok
|
MEC17-04096
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:52:15 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by anthony allen- not home no access- please schedule with homeowner- left notice front door
|
MEC18-03176
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:51:43 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by anthony allen- not home no access- please schedule with homeowner- left notice front door
|
MEC18-03378
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:42:34 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt- final ok
|
MEC18-00904
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:31:00 AM | A | PASS |
|
|
Owner: Karan Justus ###-#### asking for a morning inspection please.
Field Super: Chad Robertson ###-#### Phone #: ###-#### Inspection requested via web by Lisa Whitney- final ok
|
MEC18-04701
| Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 10:00:27 AM | A | PASS |
|
|
mec and firepl Phone #: ###-#### Inspection requested via web by Oleg Chervak- fireplace R/I ok- hvac R/I ok
|
MEC18-04701
| Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 9:59:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- 20lb gas pass
|
MEC18-04716
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 9:17:03 AM | A | PASS |
|
|
please call half hour prio Phone #: ###-#### Inspection requested via web by thomas nguyen- furnace a/c coil co ok
|
MEC18-04719
| Pressure Test | 10/1/2018 | 10/2/2018 | 10/2/2018 8:54:53 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Jamie Scibior- gauge at 49 psi- need inert tape on gas line where penetrates into building- sediment traps need to be installed between gas shut off and appliance- b vent needs insulation shields around pipe at ceiling with minimum clearnce of 1" and stubs down 2" below insulation
|
MEC18-02536
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 8:39:57 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
MEC18-02593
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 8:39:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|
MEC18-02260
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 8:39:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Benny Arreola- final ok
|