ELE18-03648
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 2:08:06 PM | P | PASS |
|
|
call 1/2 hr before to meet // kevin Phone #: ###-#### Ok final. Panel labeled.
|
ELE18-00822
| Electrical Rough-In | 10/2/2018 | 10/2/2018 | 10/2/2018 1:49:01 PM | P | PASS |
|
|
Hi, requesting electrical rough in inspection. I''m at the house all day today. Thanks, Austin Phone #: ###-#### Inspection requested via web by Lauren Perreault Ok cover kitchen area.
|
ELE18-03648
| Permanent Service | 10/1/2018 | 10/2/2018 | 10/2/2018 1:21:29 PM | P | CANC |
|
|
call 1/2 hr before to meet // kevin Phone #: ###-#### No permanent service. This is just a new sub panel replacing existing.
|
ELE18-02640
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 1:20:30 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by cris flores Ok final.
|
ELE18-02640
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 1:20:14 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by cris flores Duplicate inspection.
|
ELE18-03461
| Final | 10/2/2018 | 10/2/2018 | 10/2/2018 1:19:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Ok final
|
ELE18-02810
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 11:42:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Chris Berthelot Ok final.
|
ELE18-03475
| Final | 9/25/2018 | 10/2/2018 | 10/2/2018 11:12:51 AM | A | NR |
|
|
Electrical Final Any Questions Please Call Louis At ###-#### Phone #: ###-#### Inspection requested via web by Louis Keller
|
ELE18-03716
| Rough-In Permanent Service | 10/1/2018 | 10/2/2018 | 10/2/2018 11:00:29 AM | A | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk p/s u/g n ok
|
ELE18-03760
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 11:00:12 AM | A | PASS |
|
|
If you would please call Rick at ###-#### - 30 mins to Inspection ; he will meet you for access and any questions! Thx. Steve, BPL Phone #: ###-#### Inspection requested via web by Steven Meredith Ok final. No bonding required. GFI functions properly.
|
ELE18-03644
| Final | 10/1/2018 | 10/2/2018 | 10/2/2018 10:59:42 AM | A | PASS |
|
|
730am for inspection..Talked to homeowner yesterday at 2pm to re-schedule. Ok final.
|
ELE18-03697
| Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/2/2018 10:02:24 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Josh Pennington 1. 110.26 Gas meter located in front of new panel location. Could present unsafe working clearance. 2. 250.104(B) Metal conduit feeding meter to new panel needs bonded on accessible side. 3. Verify size of SER feeding interior panel. 4. Verify GEC termination to ground rod or UFER. If cannot verify, 2 ground rods will be installed. 5. Any box mounted with unacceptable means, wil need to be replaced with new. 2 gang back of house is mounted with screws through side of box. 6. It appears IDP meter tab has been tampered with. It looks like metal clip has been pulled apart and re-inserted.
|
ELE18-03705
| Electrical Rough-In | 10/1/2018 | 10/2/2018 | 10/1/2018 1:51:27 PM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by Josh Pennington Inspection cancelled from web by: Josh Pennington
|