ELE19-03145
| Electrical Rough-In | 10/2/2019 | 10/2/2019 | 10/3/2019 7:31:25 AM | P | PASS |
|
|
Under slab Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover grd work on center to E side of slab
|
ELE19-01991
| Final | 10/2/2019 | 10/2/2019 | 10/2/2019 2:16:31 PM | P | PASS |
|
|
I will need to meet to allow access- have a couple lights to hang - 12-1 would be good will call later to schedule Phone #: ###-#### Inspection requested via web by dennis mcneely Ok final kitchen. 1 area with no GFI protection is in the back of a cabinet not attached to counter tops for a Micro.
|
ELE19-03571
| Temporary Service | 10/2/2019 | 10/2/2019 | 10/2/2019 1:29:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jamie berg t/s o/h n ok
|
ELE19-03748
| Electrical Rough-In | 10/2/2019 | 10/2/2019 | 10/2/2019 12:09:20 PM | P | PASS |
|
|
for cover Phone #: ###-#### Inspection requested via web by Kevin Burke Ok cover shed. 2-20a circiuts, Lts/recepts
|
ELE19-03131
| Permanent Service | 10/1/2019 | 10/2/2019 | 10/2/2019 12:07:58 PM | P | CANC |
|
|
Permanent Service with CT. Kim ###-####. Thank You Phone #: ###-#### Inspection requested via web by Steve Blackmer Rescheduled for 10/3 upon Kim's request from RME.
|
ELE19-03695
| Rough-In Permanent Service | 10/1/2019 | 10/2/2019 | 10/2/2019 10:48:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn Ok cover. p/s u/g n ok
|
ELE19-03728
| Temporary Service | 10/1/2019 | 10/2/2019 | 10/2/2019 10:48:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darryn Coburn t/s u/g n ok
|
ELE19-02288
| Final | 10/2/2019 | 10/2/2019 | 10/2/2019 10:35:41 AM | A | PASS |
|
|
garage code 4224 Phone #: ###-#### Inspection requested via web by Bob Glenn Ok final. Recess can located above mstr tub.
|
ELE19-03256
| Final | 10/1/2019 | 10/2/2019 | 10/2/2019 10:35:05 AM | A | PASS |
|
|
Brian Prussia Phone #: ###-#### Inspection requested via web by BRS Permitting Ok final. All labels present. Line side connection.
|
ELE19-03425
| Final | 10/2/2019 | 10/2/2019 | 10/2/2019 9:34:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mark M Ok final.
|
ELE19-02523
| Electrical Rough-In | 10/1/2019 | 10/2/2019 | 10/2/2019 8:47:31 AM | A | PASS |
|
|
There are 2 floor heat locations to inspect. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Ok cover flr heat 2 baths main level.
|
ELE17-03488
| ELE-Aging Inspection | 10/2/2019 | 10/2/2019 | 10/2/2019 6:02:27 AM | | DONE |
|
|
Please coordinate and schedule a final inspection.
|