Inspections for the day of: Wednesday, October 20, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-01846 BLD-Final10/19/199910/20/199910/21/1999 12:00:00 AMPFAIL
###-####---ken--fn occ Tempered glass
BLD99-01763 BLD-Framing/Rough-in10/19/199910/20/199910/20/1999 12:00:00 AMAFAIL
gib--- - ###-#### fr insp-- Nailing, Truss engineering, stair rise landing etc.
BLD99-02771 BLD-Foundation10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
gib ###-#### found
BLD99-02743 BLD-Framing/Rough-in10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
john ###-#### fr insp
MEC99-03483 Final10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
janet--- ###-#### re-insp fn
BLD99-01412 BLD-Energy code compliance10/20/199910/20/199910/20/1999 12:00:00 AMAFAIL
Rescheduled w/Perry #338
BLD99-02641 BLD-Foundation10/19/199910/20/199910/20/1999 12:00:00 AMPFAIL
Clint ###-#### (after the beep 14236) Not ready
MEC99-03458 Final10/19/199910/20/199910/20/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/19/1999 at 15:42:42. Contact: ###-####. No one from A-1 to install equipment.
BLD99-02011 BLD-Framing/Rough-in10/19/199910/20/199910/20/1999 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 10/19/1999 at 13:28:32. Contact: ###-####. Need other inspections
BLD99-02823 BLD-Framing/Rough-in10/19/199910/20/199910/20/1999 12:00:00 AMPPASS
lance ###-####
MEC99-03434 Rough-in10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/20/1999 at 10:02:18. Contact: ###-####.
MEC99-03434 Pressure Test10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/20/1999 at 10:02:53. Contact: ###-####. 60 psi
BLD99-02840 BLD-Footing10/20/199910/20/199910/20/1999 12:00:00 AMPPART
BRETT ###-#### Placing rebar splice