Inspections for the day of: Wednesday, October 20, 1999.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorStan Johnson
TitlePLM-INSPECTOR
Phone #340-1257
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM99-03297 Final10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/19/1999 at 13:37:03. Contact: ###-####.
PLM99-03561 Final10/19/199910/20/199910/20/1999 12:00:00 AMAFAIL
agustin--- ###-#### backflow insp--call 1st before insp RP required
PLM99-01475 Final10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/19/1999 at 16:11:14. Contact: ###-####.
PLM99-02750 Final10/19/199910/20/199910/20/1999 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/19/1999 at 16:17:26. Contact: ###-####. lock box 0853
PLM99-03520 Plumbing Rough-in10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/20/1999 at 08:04:43. Contact: ###-####.
PLM99-03564 Sprinkler (Final)10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
Don Roth ###-####
PLM99-03167 Final10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
###-#### SHOULD BE OPEN OR KEY IN A/C DISCONNECT BOX
PLM99-03566 Plumbing Rough-in10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
NELS ###-####
PLM99-03567 Sprinkler (Final)10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
SPRINKLER KEN ###-####
PLM99-02220 Plumbing Rough-in10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 10/20/1999 at 10:10:21. Contact: ###-####. R/I and roof drains
PLM99-03571 Final10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
w/s only scott ###-####
PLM99-03573 Final10/20/199910/20/199910/20/1999 12:00:00 AMPCANC
w/s only ###-#### SHOULD BE WATER/SEWER
PLM99-03573 Water and/or Sewer10/20/199910/20/199910/20/1999 12:00:00 AMPPASS
###-####FINAL