PLM00-02271
| Final | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PASS |
|
|
###-#### larry
|
PLM00-03659
| Plumbing Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PASS |
|
|
R/I ###-####- MICHAEL
|
PLM00-01391
| Plumbing Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 334 On 10/19/2000 pat ###-#### 10/19/2000 7:01:46 PM R/I and test ok from 1st through bottom of 3rd floor for all waste and vents except 2nd floor main bath and all rwl,s to 3rd floor.10/20/2000 11:44:08 AM 10/20/2000 11:44:31 AM
|
PLM00-00041
| Plumbing Rough-in | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 309 On 10/20/2000
|
PLM00-01484
| Final | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 08:54:39. Contact: ###-####.talked to plumber who wanted the kitchen finaled under a new permit but this is the original so I told him to call his office and have them take out two new Plumbing permits to match the two new building permits if they had 3 separate jobs.
10/20/2000 3:10:20 PM
|
PLM00-03609
| Water and/or Sewer | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
water line final charles ###-####
|
PLM00-03662
| Sprinkler (Final) | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
backflfow-- paul ###-####
|
PLM00-00041
| Plumbing Rough-in | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 10/20/2000 r/i on mezzinine 10/20/2000 2:29:22 PM
|
PLM00-03542
| Groundwork | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/20/2000 at 10:18:40. Contact: ###-####.
|
PLM00-03665
| Final | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PART |
|
|
FN --SHARON ###-#### still some equipment not set. 10/20/2000 2:07:30 PM
|