BLD00-01684
| BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 12:31:45. Contact: ###-####.
c/n posted, need temp. glass, no plans w/ # 425 10/20/2000 10:58:31 AM
|
BLD00-01550
| BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 12:52:56. Contact: ###-####.
retaining wall ftg side of house 10/20/2000 12:01:19 PM
|
BLD99-02137
| BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:17:32. Contact: ###-####.
conf. on project, ceiling, plan change 10/20/2000 10:42:42 AM
|
BLD00-02154
| BLD-Wall cover | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:22:55. Contact: ###-####.
c/n posted, ok to insulate 10/20/2000 10:41:18 AM
|
BLD00-01941
| BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
south side of 1st floor joe ###-####
note: north side, 1st floor int. framing ok to cover, not so. side 10/20/2000 2:03:28 PM
|
BLD00-01524
| BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 415 On 10/19/2000 shiela ###-####
0k to insulate 10/20/2000 1:23:40 PM
|
BLD00-01493
| BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
FT CHRIS- ###-####
wip, ok w/ verbal corrections 10/20/2000 11:32:46 AM
|
BLD00-01494
| BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
CHRIS ###-#### FT
wip, ok w/ verbal corrections 10/20/2000 11:32:20 AM
|
BLD00-01486
| BLD-Footing | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | A | PART |
|
|
FT INSP-- CHRIS ###-####
wip, ok w/ verbal corrections 10/20/2000 11:33:12 AM
|
BLD99-03667
| BLD-Final | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 18:25:31. Contact: ###-####.
trades not signed off 10/23/2000 8:37:40 AM
|
BLD00-00668
| BLD-Energy code compliance | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PART |
|
|
Miki ###-####
c/n posted, ok to rock unaffected areas 10/20/2000 4:57:05 PM
|
BLD00-01864
| BLD-Framing/Rough-in | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | FAIL |
|
|
shear panel -jim ###-####
no plans, no one on site, do not side 10/20/2000 4:05:25 PM
|
BLD00-01803
| BLD-Final | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | FAIL |
|
|
bob orr ###-####
c/n posted, verify trade sign offs, have eng. give revision on modular hold downs or change out to be like plans
10/20/2000 2:50:21 PM
|
BLD00-03139
| BLD-Footing | 10/20/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PART |
|
|
###-####
set back in rear is 10", verify firewall on alley 10/20/2000 3:26:36 PM
|
BLD00-03003
| BLD-Final | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 10/19/2000
18006216836 10/19/2000 4:40:20 PM
|
BLD00-02638
| BLD-Framing/Rough-in | 10/19/2000 | 10/20/2000 | 10/20/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 10:04:40. Contact: ###-####.
ok to insulate and rock 10/20/2000 3:48:39 PM
|
MEC00-03448
| Rough-in | 10/19/2000 | 10/20/2000 | 10/19/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:02:00. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/19/2000 at 13:18:22.
|
MEC00-03448
| Pressure Test | 10/19/2000 | 10/20/2000 | 10/19/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 10/19/2000 at 13:02:15. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 10/19/2000 at 13:18:50.
|