Inspections for the day of: Thursday, October 20, 2005.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00426 INSP-Alarm Testing10/20/200510/20/200510/20/2005 4:51:01 PMACANC
The shell permit must be finaled prior to final acceptance of the TI permit, no time for this inspection today.
FIR05-00075 INSP-Alarm Testing10/20/200510/20/200510/20/2005 4:47:39 PMPFAIL
PIV tamper failed to function properly, the north elevator failed to recall upon smoke detection, the west elevator is not completed to allow testing, elevator control voltage needs to be monitored as a supervisory not a trouble signal, provide a sign at the door to the FACP, testing not completed today due to time constraints.
FIR05-00089 INSP-Final Inspection10/20/200510/20/200510/20/2005 4:39:46 PMPFAIL
PIV tamper is not adjusted correctly, the flow switch operates intermittently causing the outside bell to cycle on and off, no overhead looked at today due to time constraints.
BLD05-01279 FIRE-Final Inspection10/19/200510/20/200510/20/2005 3:39:59 PMPFAIL
Provide approved door hardware at driver and dispatcher room doors--must be opened in a single motion without the use of a key or special knowledge or effort, provide signage at express room door if keyed locking hardware is to remain or remove deadbolt, see plan review note #1 for door hardware requirements.
BLD05-01979 FIRE-Final Inspection10/20/200510/20/200510/20/2005 2:46:26 PMPFAIL
Door at NE corner needs approved hardware, provide building address numbers min. 4" high facing the street to which building is addressed, provide knox box.
BLD05-01979 FIRE-Alarm Testing10/20/200510/20/200510/20/2005 2:44:30 PMPFAIL
Door at NE corner needs approved hardware, provide building address numbers min. 4" high, provide knox box.
BLD05-02844 FIRE-Final Inspection10/20/200510/20/200510/20/2005 2:43:09 PMPFAIL
The door at northeast side needs approved hardware installed, the shell permit must be finaled prior to the TI, shell needs building address and a knox box.
BLD05-02844 FIRE-Alarm Testing10/20/200510/20/200510/20/2005 2:40:56 PMPFAIL
The exit door at northeast side needs approved hardware installed, the shell permit must be finaled prior to TI which needs building address numbers and a knox box installed.
BLD05-02031 FIRE-Final Inspection10/20/200510/20/200510/20/2005 2:38:20 PMPFAIL
The HVAC duct smoke detector failed to activate.
BLD05-02031 FIRE-Alarm Testing10/20/200510/20/200510/20/2005 2:37:35 PMPFAIL
The HVAC duct smoke detector failed to activate.
BLD05-01980 FIRE-Final Inspection10/20/200510/20/200510/20/2005 2:36:38 PMPFAIL
HVAC duct smoke detector failed to activate.
BLD05-01980 FIRE-Alarm Testing10/20/200510/20/200510/20/2005 2:35:38 PMPFAIL
HVAC duct smoke detector failed to activate.
FIR05-00462 INSP-Sprinkler Rough-in/Hydro10/19/200510/20/200510/20/2005 1:38:48 PMPPASS
This inspection was for a final on the alarm permit which passed.
FIR05-00372 INSP-Sprinkler Rough-in/Hydro10/19/200510/20/200510/20/2005 11:16:09 AMAPART
Witnessed testing and start up of the fire pump, tested at 150%, 100%, rated flow and shutoff, tested jockey pump, need to run drain from pump casing, need to install sensing lines per NFPA 20.
FIR05-00372 INSP-Sprinkler Rough-in10/18/200510/20/200510/20/2005 11:08:48 AMANR
Per Matt the shell rough-in is not ready for inspection at this time.
FIR05-00459 INSP-Alarm Testing10/18/200510/20/200510/20/2005 8:57:12 AMANR
Work is not complete per discussion with contractor, inspection to be rescheduled.
BLD04-01076 FIRE-Final Inspection10/19/200510/20/200510/20/2005 8:37:35 AMAFAIL
Provide one 2A10BC fire ext. with current inspection tag, provide approved door hardware at exit door as discussed.