FIR06-00090
| INSP-Final Inspection | 10/20/2006 | 10/20/2006 | 10/23/2006 12:51:28 PM | P | CANC |
|
|
Inspection to be rescheduled per agreement.
|
FIR05-00772
| INSP-Sprinkler Rough-in/Hydro | 10/19/2006 | 10/20/2006 | 10/20/2006 3:35:54 PM | P | PART |
|
|
UG fire supply line hydro test is satisfactory.
|
FIR05-00425
| INSP-Sprinkler Rough-in | 10/19/2006 | 10/20/2006 | 10/20/2006 3:29:15 PM | A | PART |
|
|
Piping in the pool room 5th floor matches plans provided, calcs for this remote area to be verified by plan reviewer at resubmittal.
|
FIR06-00649
| INSP-Final Inspection | 10/19/2006 | 10/20/2006 | 10/20/2006 2:50:15 PM | A | PART |
|
|
Fire alarm tested okay, the sample and vent tubes on one duct detector are reversed.
|
BLD06-01860
| FIRE-Final Inspection | 10/19/2006 | 10/20/2006 | 10/20/2006 2:48:39 PM | P | FAIL |
|
|
The project related fire sprinkler permit must be finaled prior to life safety final, also missing PFE, project is not in a condition for final life safety inspection at this time.
|
BLD06-01553
| FIRE-Final Inspection | 10/19/2006 | 10/20/2006 | 10/20/2006 2:46:07 PM | P | PASS |
|
|
Required corrections have been made, inspection passed.
|
FIR06-00606
| INSP-Final Inspection | 10/19/2006 | 10/20/2006 | 10/20/2006 2:44:27 PM | A | PASS |
|
|
Fire alarm work is satisfactory, permit finaled.
|
FIR06-00753
| INSP-Sprinkler Rough-in/Hydro | 10/19/2006 | 10/20/2006 | 10/20/2006 12:01:44 PM | A | NR |
|
|
Hydrostatic test for the UG to be rescheduled.
|
FIR06-00753
| INSP-Supply line flush | 10/19/2006 | 10/20/2006 | 10/20/2006 11:37:37 AM | A | PART |
|
|
UG fire supply line flush performed satisfactory.
|
FIR06-00596
| INSP-Alarm Testing | 10/18/2006 | 10/20/2006 | 10/20/2006 10:42:45 AM | A | NR |
|
|
rob - note: fire alarm only - 6th floor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Sufficient visual notification coverage at ADA room 10x cannot yet be determined due to missing room finishes and hardware, door holders are not ready for inspection, elevator is not ready for inspection. Coverage at the SW ADA room and adjacent corridor is acceptable.
|
FIR06-00558
| INSP-Sprinkler Rough-in | 10/19/2006 | 10/20/2006 | 10/20/2006 10:28:03 AM | A | PART |
|
|
OH rough in at the ground floor section A surgery waiting is okay to cover except one area as circled on approved plans which is overspaced.
|
FIR06-00560
| INSP-Sprinkler Rough-in | 10/19/2006 | 10/20/2006 | 10/20/2006 10:26:10 AM | A | PART |
|
|
OH rough-in is good for cover at the drop ceiling areas.
|
FIR06-00595
| INSP-Alarm Testing | 10/17/2006 | 10/20/2006 | 10/20/2006 9:32:42 AM | A | FAIL |
|
|
Testing for the 2nd floor NE quad only, need to relocate one notifcation device as marked on plans for proper coverage, missing one h/s at the west side division between quadrants, added sd at the electrical room to be shown on plans.
|