PLM08-01940
| PLM-Aging Inspection | 10/20/2008 | 10/20/2008 | 10/21/2008 10:45:52 AM | | PASS |
|
|
|
PLM07-03600
| Other | 10/20/2008 | 10/20/2008 | 10/20/2008 4:39:43 PM | P | DONE |
|
|
doc - conference Phone #: ###-####
|
PLM08-02422
| Final | 10/20/2008 | 10/20/2008 | 10/20/2008 3:58:44 PM | P | FAIL |
|
|
SEWER FINAL Phone #: ###-#### Internet Inspection Request from: Allison Briggs-water & sewer test failed.-need to use approved transition glue from abs to pvc.
|
PLM08-02455
| Water and/or Sewer | 10/17/2008 | 10/20/2008 | 10/20/2008 3:40:05 PM | P | PART |
|
|
susan Note: after 2:00 pm is possible Phone #: ###-####-sewer pass.
|
PLM07-01570
| Final | 10/20/2008 | 10/20/2008 | 10/20/2008 2:26:03 PM | P | PASS |
|
|
|
PLM06-01866
| Final | 10/20/2008 | 10/20/2008 | 10/20/2008 2:25:39 PM | P | PASS |
|
|
eric
|
ESC08-00332
| Random Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 11:13:14 AM | A | FAIL |
|
|
left verbal correction with rp to clean di box, dirt & debris off all hard surfaces & post esc sign by 10-22-08 pm.
|
ESC08-00267
| BMP Violation | 10/17/2008 | 10/20/2008 | 10/20/2008 10:36:38 AM | A | PART |
|
|
met with steve web, di boxes have been cleaned & rp is cleanind parking lot.
|
PLM08-02436
| Plumbing Rough-in | 10/17/2008 | 10/20/2008 | 10/20/2008 10:33:57 AM | A | PASS |
|
|
Ready by 10:00AM Phone #: ###-#### Internet Inspection Request from: John Hensley
|
PLM08-02436
| DOC - Permit Finaled | 10/20/2008 | 10/20/2008 | 10/20/2008 10:33:46 AM | P | PASS |
|
|
Ready by 10:00AM Phone #: ###-#### Internet Inspection Request from: John Hensley
|
ESC08-00698
| General Inspection | 10/20/2008 | 10/20/2008 | 10/20/2008 9:16:15 AM | A | PART |
|
|
left verbal correction with rp that if not going to have water & sewer backfilled by 10-22-08 that stockpile will have to be stablized from street.
|