FIR11-00273
| INSP-Alarm Testing | 10/20/2011 | 10/20/2011 | 10/25/2011 2:20:09 PM | A | PASS |
|
|
Tim Christopherson- phone #: ###-#### call 30 min. prior.
|
FIR11-00418
| INSP-Sprinkler Rough-in | 10/20/2011 | 10/20/2011 | 10/20/2011 4:22:03 PM | P | PART |
|
|
Verified additional coverage at the file storage room. Grid ceilings okay to cover.
|
FIR05-00538
| INSP-Final Inspection | 10/20/2011 | 10/20/2011 | 10/20/2011 4:19:57 PM | P | PASS |
|
|
Fire alarm permit finaled.
|
FIR11-00414
| INSP-Sprinkler Rough-in/Hydro | 10/19/2011 | 10/20/2011 | 10/20/2011 4:19:08 PM | P | PART |
|
|
2nd floor hydrostatic test passed.
|
BLD11-00669
| FIRE-Final Inspection | 10/20/2011 | 10/20/2011 | 10/20/2011 4:18:11 PM | P | PASS |
|
|
Fire life safety finaled. Inspection passed, signature card not available on site.
|
BLD11-02415
| FIRE-Final Inspection | 10/20/2011 | 10/20/2011 | 10/20/2011 1:04:31 PM | P | PASS |
|
|
C/N items verified. Fire life safety inspection passed.
|
FIR11-00194
| INSP-Conference | 10/20/2011 | 10/20/2011 | 10/20/2011 1:03:16 PM | A | DONE |
|
|
Regarding plan resubmittal for floorplan and branchline/main relocation.
|
BLD11-01805
| FIRE-Sprinkler Rough-in | 10/20/2011 | 10/20/2011 | 10/20/2011 12:59:38 PM | A | PART |
|
|
Overhead fire sprinkler work approved for ceiling cover.
|
FIR11-00546
| INSP-Sprinkler Rough-in | 10/20/2011 | 10/20/2011 | 10/20/2011 12:58:40 PM | A | PART |
|
|
Patient room #1 okay to cover. Remainder of overhead work completed with the exception of missing coverage at an electrical/comm. closet.
|