BLD15-04514
| FIRE-Final Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 2:03:24 PM | P | FAIL |
|
|
Provide occupant load sign, provide single action hardware on the restroom doors, mount the fire extinguishers, remove hardware from the west front door. Provide the fire review comments.
|
BLD16-02571
| FIRE-Final Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 12:45:13 PM | P | PASS |
|
|
Life safety passed
|
BLD16-00628
| FIRE-Final Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 12:44:20 PM | P | PART |
|
|
A temporary occupancy for life safety is ok per Scott for 30 days so that the project related fire alarm permit can be addressed.
|
BLD16-01549
| FIRE-Final Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 10:35:07 AM | A | PASS |
|
|
Life safety passed. I discussed with the general contractor about the racks, including the vertical and horizontal portions can not be over 8'. He was going to have the racks modified prior to a building inspection.
|
FIR16-00357
| INSP-Alarm Testing | 10/19/2016 | 10/20/2016 | 10/20/2016 10:30:04 AM | A | PART |
|
|
For a final sign off the new notification devices need to be installed and tested. Per Scott Arellano a 30 temporary for life safety is ok until the new devices are installed and tested.
|