Inspections for the day of: Friday, October 20, 2017.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR17-00438 INSP-Final Inspection10/19/201710/20/201710/20/2017 4:20:10 PMPPASS
Fire alarm inspection complete per scope of work associated with this permit. A new fire alarm permit will be submitted for future work, Smoke detectors/heat detectors in clean room area will be included on new permit submission.
BLD17-00669 FIRE-Final Inspection10/20/201710/20/201710/20/2017 3:27:36 PMPFAIL
Install addressing on exterior of building. In-duct detector needs to be tested for HVAC unti shutdown. Double key deadbolt with indicator or lever type door hardware needs to be installed in place of the thumbturn deadbolt assembly currently in place.
FIR17-00326 INSP-Sprinkler Rough-in10/20/201710/20/201710/20/2017 2:33:46 PMPPASS
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
FIR17-00418 INSP-Sprinkler Rough-in10/20/201710/20/201710/20/2017 2:33:04 PMPCANC
Inspection request was for a rough to cover inspection for fire sprinklers, not fire alarms, this inspection request is cancelled.
FIR17-00147 INSP-Final Inspection10/19/201710/20/201710/20/2017 2:00:25 PMPCANC
Coordination needs to happen between contractors/building managers of Boise Center on the Grove as well as City Center Plaza Districts for this inspection to be completed. This request is cancelled.
FIR16-00268 INSP-Final Inspection10/20/201710/20/201710/20/2017 1:51:21 PMPPASS
Final fire sprinkler inspection for area of work passed/complete.
FIR16-00293 INSP-Final Inspection10/18/201710/20/201710/20/2017 1:47:56 PMPPASS
Final fire alarm inspection passed/complete.
BLD17-03751 FIRE-Final Inspection10/19/201710/20/201710/20/2017 12:41:08 PMAPASS
No fire sprinklers, no fire alarms, fire extinguisher is mounted with a current inspection tag. Final life fire safety inspection passed/complete.
FIR17-00308 INSP-Final Inspection10/20/201710/20/201710/20/2017 12:07:11 PMPPASS
Final fire sprinkler inspection passed/complete.
BLD17-01813 FIRE-Final Inspection10/19/201710/20/201710/20/2017 11:12:13 AMAPASS
No fire sprinkler modifications, no fire alarm modifications, fire extinguishers are in common area's with current inspection tags. Final life fire safety inspection for area of work passed/complete.
FIR17-00365 INSP-Sprinkler Rough-in/Hydro10/19/201710/20/201710/20/2017 10:21:40 AMAPASS
Hydrostatic test for underground supply complete.
FIR17-00587 INSP-Sprinkler Rough-in10/19/201710/20/201710/20/2017 10:04:29 AMAPASS
Hydrostatic test for underground supply complete.
FIR16-00784 INSP-Final Inspection10/19/201710/20/201710/20/2017 9:42:58 AMAFAIL
Signal sync issue needs to be repaired. Smoke detector in the northeast corridor exit needs to be relocated to be 36 inches away from return air. Annual inspection needs to be completed on fire sprinkler system.
BLD17-02522 FIRE-Final Inspection10/19/201710/20/201710/20/2017 8:49:44 AMAPASS
No fire sprinklers, no fire alarms, fire extinguisher is in common area with a current inspection tag. Final life fire safety inspection passed/complete.
FIR17-00587 INSP-Sprinkler Rough-in/Hydro10/19/201710/20/201710/20/2017 8:31:34 AMACANC
Duplicate inspection request, this request is cancelled.
FIR16-00284 INSP-Sprinkler Rough-in/Hydro10/19/201710/20/201710/20/2017 8:30:31 AMAPASS
24 hour air test complete.