ELE00-04736
| Final | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | | CANC |
|
|
###-#### key under mat at back door
|
ELE02-02732
| Final | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | CANC |
|
|
###-####
not ready
10/21/2002 8:09:01 AM
|
ELE01-00541
| Final | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 09:54:53. Contact: ###-####.
|
ELE02-03038
| Electrical Rough-In | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 12:00:07. Contact: ###-####.
not ready 10/21/2002 9:23:39 AM
|
ELE02-03081
| Electrical Rough-In | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 10/18/2002 at 15:27:34. Contact: ###-####.
walls ok 10/21/2002 9:05:31 AM
|
ELE02-00600
| Final | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | NR |
|
|
###-#### post card
open walls and ceiling 10/21/2002 9:43:48 AM
|
ELE02-03186
| Rough-In Permanent Service | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 07:27:04. Contact: ###-####.
check for Guy kit on final
P/S O/H N Ok 10/21/2002 10:41:32 AM
|
ELE01-03524
| Electrical Rough-In | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | NR |
|
|
###-#### mike CONFERENCE
extend permit 10/21/2002 10:49:12 AM
|
ELE02-01078
| Final | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | FAIL |
|
|
###-#### CUSTOMER SAYS MARV. FINALED JOB
no recep inside or light for man-door 10/21/2002 2:28:26 PM
|
ELE01-01141
| Temporary Service | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | DONE |
|
|
THIS WAS DONE ON 4-10-01??? HOUSE IS DONE JOB NEEDS FINAL ###-####
|
ELE02-03183
| Electrical Rough-In | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | FAIL |
|
|
###-#### MARK
250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes.
Where circuit conductors are spliced within a box, or terminated on equipment within or supported by a box, any separate equipment grounding conductors associated with those circuit conductors shall be spliced or joined within the box
314.43 Nonmetallic Boxes.
Provisions for supports or other mounting means for nonmetallic boxes shall be outside of the box
300.4 Protection Against Physical Damage.
Where subject to physical damage, conductors shall be adequately protected.
(D) Cables and Raceways Parallel to Framing Members.
300.14 Length of Free Conductors at Outlets, Junctions, and Switch Points.
At least 150 mm (6 in.) of free conductor
314.16 Number of Conductors in Outlet, Device, and Junction Boxes, and Conduit Bodies.
Boxes and conduit bodies shall be of sufficient size to provide free space for all enclosed conductors.
10/21/2002 3:42:10 PM
|
ELE02-03038
| Electrical Rough-In | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 09:31:18. Contact: ###-####.
|
ELE02-03225
| Electrical Rough-In | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | NR |
|
|
late pm ###-####
|
ELE01-03949
| Final | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 10/21/2002 at 10:08:38. Contact: ###-####.
|
ELE02-03264
| Permanent Service | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### SERVICE ONLY
is 505 10/21/2002 12:54:04 PM
this was only a sub fed panel change not a service
ok 10/21/2002 2:04:00 PM
|
ELE02-03229
| Permanent Service | 10/21/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | PART |
|
|
###-####
P/S O/H R Ok
for changeover 10/21/2002 4:28:34 PM
|
ELE01-03848
| Final | 10/18/2002 | 10/21/2002 | 10/21/2002 12:00:00 AM | P | PASS |
|
|
###-#### ALLISON
|