Inspections for the day of: Monday, October 21, 2002.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE00-04736 Final10/21/200210/21/200210/21/2002 12:00:00 AM CANC
###-#### key under mat at back door
ELE02-02732 Final10/18/200210/21/200210/21/2002 12:00:00 AMACANC
###-####
not ready
10/21/2002 8:09:01 AM
ELE01-00541 Final10/18/200210/21/200210/21/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/18/2002 at 09:54:53. Contact: ###-####.
ELE02-03038 Electrical Rough-In10/18/200210/21/200210/21/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 10/18/2002 at 12:00:07. Contact: ###-####.
not ready 10/21/2002 9:23:39 AM
ELE02-03081 Electrical Rough-In10/18/200210/21/200210/21/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 10/18/2002 at 15:27:34. Contact: ###-####.
walls ok 10/21/2002 9:05:31 AM
ELE02-00600 Final10/18/200210/21/200210/21/2002 12:00:00 AMANR
###-#### post card
open walls and ceiling 10/21/2002 9:43:48 AM
ELE02-03186 Rough-In Permanent Service10/21/200210/21/200210/21/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 10/21/2002 at 07:27:04. Contact: ###-####.
check for Guy kit on final
P/S O/H N Ok 10/21/2002 10:41:32 AM
ELE01-03524 Electrical Rough-In10/21/200210/21/200210/21/2002 12:00:00 AMPNR
###-#### mike CONFERENCE
extend permit 10/21/2002 10:49:12 AM
ELE02-01078 Final10/21/200210/21/200210/21/2002 12:00:00 AMPFAIL
###-#### CUSTOMER SAYS MARV. FINALED JOB
no recep inside or light for man-door 10/21/2002 2:28:26 PM
ELE01-01141 Temporary Service10/21/200210/21/200210/21/2002 12:00:00 AMPDONE
THIS WAS DONE ON 4-10-01??? HOUSE IS DONE JOB NEEDS FINAL ###-####
ELE02-03183 Electrical Rough-In10/21/200210/21/200210/21/2002 12:00:00 AMPFAIL
###-#### MARK
250.148 Continuity and Attachment of Equipment Grounding Conductors to Boxes.
Where circuit conductors are spliced within a box, or terminated on equipment within or supported by a box, any separate equipment grounding conductors associated with those circuit conductors shall be spliced or joined within the box

314.43 Nonmetallic Boxes.
Provisions for supports or other mounting means for nonmetallic boxes shall be outside of the box

300.4 Protection Against Physical Damage.
Where subject to physical damage, conductors shall be adequately protected.
(D) Cables and Raceways Parallel to Framing Members.

300.14 Length of Free Conductors at Outlets, Junctions, and Switch Points.
At least 150 mm (6 in.) of free conductor

314.16 Number of Conductors in Outlet, Device, and Junction Boxes, and Conduit Bodies.
Boxes and conduit bodies shall be of sufficient size to provide free space for all enclosed conductors.
10/21/2002 3:42:10 PM
ELE02-03038 Electrical Rough-In10/21/200210/21/200210/21/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 10/21/2002 at 09:31:18. Contact: ###-####.
ELE02-03225 Electrical Rough-In10/21/200210/21/200210/21/2002 12:00:00 AMPNR
late pm ###-####
ELE01-03949 Final10/21/200210/21/200210/21/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 10/21/2002 at 10:08:38. Contact: ###-####.
ELE02-03264 Permanent Service10/21/200210/21/200210/21/2002 12:00:00 AMPPASS
###-#### SERVICE ONLY
is 505 10/21/2002 12:54:04 PM
this was only a sub fed panel change not a service
ok 10/21/2002 2:04:00 PM
ELE02-03229 Permanent Service10/21/200210/21/200210/21/2002 12:00:00 AMPPART
###-####
P/S O/H R Ok
for changeover 10/21/2002 4:28:34 PM
ELE01-03848 Final10/18/200210/21/200210/21/2002 12:00:00 AMPPASS
###-#### ALLISON