ESC04-01076
| BMP Violation | 10/20/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | A | PART |
|
|
Improvement from last inspection. 10/21/2004 3:02:02 PM
|
ESC04-00581
| Site Final | 10/20/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | A | PART |
|
|
Improvement from last inspection. 10/21/2004 3:01:35 PM
|
ESC04-01358
| Site Preparation | 10/18/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | A | CANC |
|
|
Received a 48 hour notice to start excavation on 10/18/04. Please check out.
|
ESC04-01004
| Tracking Control | 10/20/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | A | PART |
|
|
WIP Conference with developer. Will follow up. 10/21/2004 1:45:01 PM
|
ESC04-00332
| Tracking Control | 10/20/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | P | PART |
|
|
|
ESC04-00679
| Tracking Control | 10/21/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | P | FAIL |
|
|
Excessive track out onto Mcmillian, correction to rp--sweep as needed. Will follow up. 10/21/2004 1:02:00 PM
|
ESC04-01061
| Site Preparation | 10/21/2004 | 10/21/2004 | 10/21/2004 12:00:00 AM | P | PART |
|
|
Site is ok except entrance, needs some source of rock to reduce mud/dirt track out. Will Follow up. Contacted rp. 10/21/2004 3:15:46 PM
|