FIR05-00559
| INSP-Final Inspection | 10/19/2005 | 10/21/2005 | 10/21/2005 5:29:48 PM | P | CANC |
|
|
No time available for this inspection today, spoke with Kelly to reschedule for monday 10/24 per our agreement.
|
FIR05-00492
| INSP-Final Inspection | 10/20/2005 | 10/21/2005 | 10/21/2005 5:28:33 PM | P | CANC |
|
|
No time for this inspection today, spoke with Rick to reschedule for monday 10/24.
|
FIR05-00426
| INSP-Alarm Testing | 10/21/2005 | 10/21/2005 | 10/21/2005 5:27:19 PM | P | FAIL |
|
|
Provide correct sample tubes for the duct width intended, verify correct location for duct detectors, strobe in seating area is overspaced and installed on the wrong column, one 75cd strobe in the kitchen area is blocked, the strobes for outside seating area do not match approved plan, no other items tested at this time.
|
FIR05-00089
| INSP-Sprinkler Rough-in/Hydro | 10/21/2005 | 10/21/2005 | 10/21/2005 5:21:31 PM | P | NR |
|
|
Cancel inspection per conversation with Brian.
|
FIR05-00076
| INSP-Alarm Testing | 10/21/2005 | 10/21/2005 | 10/21/2005 5:20:10 PM | P | FAIL |
|
|
Lower pull station to 48" AFF, provide additional smoke at the panel due to beam blockage, verify audibility in the FACP room, fire pump run shows as an alarm and the matrix indicates a supervisory, change label at roof tamper and stair flow 108, outside bell shall silence upon waterflow ceasation, all sprinkler alarms tested today, no other items tested at this time.
|
MIS05-00079
| FIR-Final | 10/20/2005 | 10/21/2005 | 10/21/2005 5:13:05 PM | A | FAIL |
|
|
Overhead roll up door is not allowed above the main entry/exit to block the egress under any circumstance in this A3 occupancy.
|
FIR05-00075
| INSP-Alarm Testing | 10/18/2005 | 10/21/2005 | 10/21/2005 5:10:46 PM | A | FAIL |
|
|
Heat detector in the north elevator pit is too far from the sprinkler head, provide resubmittals for the EOL 2nd floor, tape on strobe and no ceiling tile 1st floor north, west elevator is not complete, provide sign at the door to FACP room, provide audible notification for the electrical room and FACP, provide knox box.
|
FIR05-00459
| INSP-Alarm Testing | 10/20/2005 | 10/21/2005 | 10/21/2005 5:04:04 PM | A | NR |
|
|
The core and shell permit must be finaled prior to TI approval.
|
FIR05-00406
| INSP-Final Inspection | 10/20/2005 | 10/21/2005 | 10/21/2005 4:55:31 PM | A | PART |
|
|
Area notification devices tested satisfactory except in two areas which are not complete yet, will final when all devices have been installed and EOL is measured.
|
FIR05-00089
| INSP-Final Inspection | 10/19/2005 | 10/21/2005 | 10/20/2005 8:44:23 AM | A | CANC |
|
|
contact brian calkins.; Phone #: ###-#### Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley
|