FIR09-00479
| INSP-Sprinkler Rough-in | 10/21/2009 | 10/21/2009 | 10/22/2009 4:59:38 PM | P | PART |
|
|
Duplicate, see site inspection comments 10/22.
|
FIR09-00572
| INSP-Sprinkler Rough-in | 10/21/2009 | 10/21/2009 | 10/21/2009 2:53:57 PM | P | PART |
|
|
Added pendent in the concealed combustible space at the second level is approved for cover, remainder of items on C/N are not yet finished.
|
BLD09-01837
| FIRE-Final Inspection | 10/21/2009 | 10/21/2009 | 10/21/2009 2:52:39 PM | P | FAIL |
|
|
Remove the manual thumbturn at the main entry/exit door and provide approved hardware and "door to remain...." signage, repair existing EM lighting at the office and warehouse areas, see permit documents for details pertaining.
|
BLD09-01825
| FIRE-Final Inspection | 10/20/2009 | 10/21/2009 | 10/21/2009 11:14:00 AM | A | PASS |
|
|
Items on correction notice are finished, fire life safety final passed.
|
FIR09-00364
| INSP-Sprinkler Rough-in/Hydro | 10/20/2009 | 10/21/2009 | 10/21/2009 11:13:13 AM | A | PART |
|
|
Overhead fire sprinkler work at the sheetrock ceiling above the reception desk is okay for cover.
|