Inspections for the day of: Wednesday, October 21, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00650 FIRE-Final Inspection10/20/200910/21/200910/21/2009 3:40:35 PMPPASS
Life safety passed.
FIR09-00523 INSP-Final Inspection10/20/200910/21/200910/21/2009 3:38:47 PMPPASS
Permit finaled. As-builts have been provided that show the revised source for the new NAC circuit.
FIR09-00609 INSP-Sprinkler Rough-in10/21/200910/21/200910/21/2009 3:34:55 PMPFAIL
The sprinkler rough-in is passed. But existing insulation, mounted at the deck, is hanging down thus creating obstructions to the upright sprinkler coverage. This will need to be repaired prior to a approval for cover being given.
FIR06-00056 INSP-Final Inspection10/20/200910/21/200910/21/2009 12:48:17 PMAPASS
Permit finaled. The insulation issue is being addressed under the new permit FIR09-00609.
BLD09-00946 FIRE-Final Inspection10/21/200910/21/200910/21/2009 11:25:32 AMAPART
Life safety passed in Phase I of this project.
FIR09-00482 INSP-Supply line flush10/20/200910/21/200910/21/2009 11:00:18 AMAPASS
The underground supply flush passed inspection.
FIR09-00457 INSP-Final Inspection10/20/200910/21/200910/21/2009 10:59:45 AMAPART
The Phase I sprinkler work is complete except for a couple of ceiling tiles which Darren with HC Company stated he would get installed.
FIR09-00601 INSP-Final Inspection10/20/200910/21/200910/21/2009 10:58:44 AMAPART
The phase I area fire alarm testing is complete. The first visit I found missing a/v's and incorrect candella settings. At the second visit these items had been corrected. As-builts will be required prior to final sign off showing the a/v changes.