ESC12-01014
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 1:45:23 PM | | PASS |
|
|
Permit posted. No ESC violations; site is not yet fully stabilized and interior construction is in progress.
|
ESC11-00525
| Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 1:21:18 PM | | PASS |
|
|
Open lots have perimeter BMPs installed. Drop inlet protection provided on subdivision storm drains. Minimal trackout at time of inspection. Mill station Development still in progress.
|
ESC12-01001
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 12:23:42 PM | | PASS |
|
|
Site landscaped and stabilized. No track out or other violations observed. Some minor activity is on going and wattles are still installed. Approved.
|
ESC13-00050
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 12:04:23 PM | | PASS |
|
|
Finaled. See activity notes.
|
ESC13-00050
| DOC - Permit Finaled | 10/21/2013 | 10/21/2013 | 10/21/2013 12:03:58 PM | P | PASS |
|
|
Remodel of 5 plex complete. Landscaping installed. Construction materials and BMPs have been removed. Approved for ESC final.
|
ESC12-00266
| Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 11:41:45 AM | | PASS |
|
|
Finaled.
|
ESC12-00266
| DOC - Permit Finaled | 10/21/2013 | 10/21/2013 | 10/21/2013 11:41:31 AM | P | PASS |
|
|
Site stabilized/landscaped. No exterior construction activity ongoing or ESC requirements outstanding. No further ESC inspections required.
|
ESC12-00526
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 11:28:31 AM | | PASS |
|
|
No activity or ESC violations observed at time of inspection. To be finaled upon BLD permit final.
|
ESC10-00738
| Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 11:07:31 AM | | PASS |
|
|
Project is ongoing. No ESC violations observed at time of inspection.
|
ESC13-01038
| Complaint Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 10:56:45 AM | A | PART |
|
|
Site demo is dusty, most of structure is torn down. Requested RP increase dust suppression efforts prior to demo. Water tanker on site and being utilized. Need to post permit and provide DI protection on 24th and Grace. Will reinspect following day.
|
ESC11-00156
| Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 10:16:29 AM | | PASS |
|
|
Finaled. See activity notes.
|
ESC11-00156
| DOC - Permit Finaled | 10/21/2013 | 10/21/2013 | 10/21/2013 10:16:02 AM | P | PASS |
|
|
Project complete. Yard is stabilized and landscaped. BMPs have been removed. BLD permit has been finaled. Final ESC requirements met.
|
ESC13-00822
| Site Preparation | 10/18/2013 | 10/21/2013 | 10/21/2013 9:45:04 AM | A | PASS |
|
|
doug Phone #: ###-####
Discussed project and site with RP Doug, who was onsite. DI protection on MS4 on Emerald, cement curbing lines East and North of activity. Wattles are on-site to line perimeter once footing for addition are added. Permit posted in store window. Once addition is added, stairway to Emerald will be installed with wattles on grassy bank. Approved for construction to commence.
|
ESC12-00163
| Aging Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 9:09:08 AM | | PASS |
|
|
Exterior work appears to be complete. Construction staging site still in place. No track out other ESC violations at this time. Approved.
|
ESC12-01153
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 8:59:41 AM | | PASS |
|
|
Finaled. See activity notes.
|
ESC12-01153
| DOC - Permit Finaled | 10/21/2013 | 10/21/2013 | 10/21/2013 8:59:18 AM | P | PASS |
|
|
Parking lot has been resufaced and painted. No materials or equipment left onsite. No further ESC inspections required.
|
ESC12-00030
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 8:51:15 AM | | PASS |
|
|
No activity. Project has not started; building permit was extended 10/1/2013. No ESC violations at this time.
|