ESC13-01063
| Site Preparation | 10/21/2013 | 10/21/2013 | 10/21/2013 1:58:54 PM | P | PASS |
|
|
kerry Phone #: ###-####
|
ESC13-00922
| Site Preparation | 10/21/2013 | 10/21/2013 | 10/21/2013 1:28:25 PM | P | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
Keep Sediment onsite, install BMPs on lower section (south side) of project/parcel.
|
ESC13-00617
| Site Preparation | 10/21/2013 | 10/21/2013 | 10/21/2013 1:19:20 PM | P | NR |
|
|
Clint Phone #: ###-#### Not ready for Site Prep Inspection Contractors using the lot for stockpiling, and debris use. Skidster driving out onto sidewalk tracking sediment offsite Contacted Clint and Described whats going on, and to clean sediment off of sidewalk, and keep machinery off sidewalk
|
ESC12-01155
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 1:03:54 PM | | PART |
|
|
Contacted RP via cellphone and left voicemail describing the drop inlet at the bottom of the road needs protected. Silt Fence and Waddles need to be maintain. Silt Fence Tightened up, straw waddle needs to be layed back inplace and staked. Will follow up tomorrow: 10-22-13
|
ESC12-01011
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 12:41:33 PM | | PART |
|
|
Yard has been Sodded and Hydro-seeded. Disturbed area from equiptment on south side of site needs to be re-vegetated also. Bare highly erosive sediment must be stabilized prior to ESC Final
|
ESC12-01127
| General Inspection | 10/21/2013 | 10/21/2013 | 10/21/2013 11:37:45 AM | | PART |
|
|
Hillside on west side of property needs to be Re-vegetated. Erosion currently taking place in Rilling/Gully Erosion.
|