MEC16-04682
| Final | 10/20/2016 | 10/21/2016 | 10/21/2016 4:27:02 PM | P | PASS |
|
|
Late pm inspection, we are installing same day. Phone #: ###-#### Inspection requested via web by Rick Montgomery
|
MEC16-04682
| Pressure Test | 10/21/2016 | 10/21/2016 | 10/21/2016 4:26:01 PM | P | PASS |
|
|
Late pm inspection, we are installing same day. Phone #: ###-#### Inspection requested via web by Rick Montgomery- 5 lb flue pass
|
MEC16-01064
| Final | 10/20/2016 | 10/21/2016 | 10/21/2016 4:00:41 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Toomey- need air balance report- need b vent for water heater hooked up- cap future gas line after shut off valve
|
MEC16-04686
| Rough-in | 10/21/2016 | 10/21/2016 | 10/21/2016 3:28:04 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak- need combustion air in furnace/wh closet-crawl needs finished-need fresh air for furnace installed- boot for power ventilated crawl has to be in open area of house- insulation shield needs 1" clearance to b vent- b vent needs 1" clearance to combustibles- need 6" fresh air to return plenum-wall needs framed around supply duct 2nd floor, flex in pinched off-need return air to master bedroom- transfer grills for upstairs bedrooms -firecaulk gas line where it penetrates into dryer box- left correction notice on front window
|
MEC16-04686
| Pressure Test | 10/21/2016 | 10/21/2016 | 10/21/2016 3:21:24 PM | P | PASS |
|
|
Inspection requested via web by Oleg Chervak- 20lb gas pass- 5lb flue pass- put sticker on ,eter stub out
|
MEC16-04663
| Final | 10/21/2016 | 10/21/2016 | 10/21/2016 2:46:34 PM | P | PASS |
|
|
Aleks ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC16-04663
| Pressure Test | 10/21/2016 | 10/21/2016 | 10/21/2016 2:46:20 PM | P | PASS |
|
|
Aleks ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- 20lb gas pass
|
MEC16-00150
| Pressure Test | 10/21/2016 | 10/21/2016 | 10/21/2016 1:29:43 PM | P | PASS |
|
|
if questions call Jerry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- 20lb gas pass westside from fireplace to mech room
|
MEC16-04684
| Rough-in | 10/20/2016 | 10/21/2016 | 10/21/2016 11:20:18 AM | A | PASS |
|
|
Homeowner (Dustin) requested an early inspection if possible. His phone number is ###-####. Please call on way to home. Thx Phone #: ###-#### Inspection requested via web by Jason Robinson- finaled this out- homeowner will be finishing it out with sheetrock and paint, no mantel
|
MEC16-04684
| Final | 10/21/2016 | 10/21/2016 | 10/21/2016 11:19:18 AM | A | PASS |
|
|
Homeowner (Dustin) requested an early inspection if possible. His phone number is ###-####. Please call on way to home. Thx Phone #: ###-#### Inspection requested via web by Jason Robinson
|
MEC15-05979
| Mec-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:59:52 AM | | CANC |
|
|
expire permit next time comes up on aging
|
MEC16-04433
| Final | 10/19/2016 | 10/21/2016 | 10/21/2016 10:38:17 AM | A | PASS |
|
|
JR will be the contact. The boiler is located inside the mechanical room on the outside of the building. Phone #: ###-#### Inspection requested via web by Melissa Kaae
|
MEC16-04645
| Final | 10/20/2016 | 10/21/2016 | 10/21/2016 9:41:26 AM | A | NR |
|
|
Aaron - ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss- will reschedule for next week according to contact, Aaron
|
MEC15-05932
| Mec-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 9:13:00 AM | | PEND |
|
|
talked with Shawn at A1 said he would get with the homeowners and schedule this
|
MEC16-01333
| Mec-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 8:53:56 AM | | NR |
|
|
work in progress- homeowner still hasnt finshed walls around it
|