ELE06-00512
| ELE-Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 2:42:27 PM | | DONE |
|
|
waiting on contractor
|
ELE16-03057
| Electrical Rough-In | 10/21/2016 | 10/21/2016 | 10/21/2016 2:40:35 PM | P | PASS |
|
|
wall cover ok
|
ELE16-02283
| Electrical Rough-In | 10/21/2016 | 10/21/2016 | 10/21/2016 12:51:40 PM | P | PASS |
|
|
This is the second phase of the rough-in inspection after the roof was closed. This inspection is for the new electrical wiring in the garage and power room before the drywall goes up. Phone #: ###-#### Inspection requested via web by Derek Newton....
garage and pwdr room approved for cover...verify washer outlet on seperate circuit and gfi protected and readily accessible-in garage-at final
|
ELE16-02143
| Final | 10/20/2016 | 10/21/2016 | 10/21/2016 11:40:34 AM | P | PASS |
|
|
Final Inspection at Truckstop Contact Steve Hess Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek....ok to final
|
ELE16-01749
| Final | 10/21/2016 | 10/21/2016 | 10/21/2016 10:29:18 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Neal Rumsey....corrections made ok to final
|
ELE16-03422
| Electrical Rough-In | 10/21/2016 | 10/21/2016 | 10/21/2016 9:45:21 AM | A | PASS |
|
|
Please call 30 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by John Edwards....ok to cover
|
ELE16-03369
| Electrical Rough-In | 10/20/2016 | 10/21/2016 | 10/21/2016 9:12:51 AM | A | PASS |
|
|
The lockbox code is 4320. Mike with Levco is your contact ###-####. If you have any questions, please call Jake at ###-####. Thank You. Phone #: ###-#### Inspection requested via web by Clay Morgan....rough in ok
|
ELE16-03424
| Temporary Service | 10/21/2016 | 10/21/2016 | 10/21/2016 8:28:07 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bob Glenn....
t/s u/g n ok
|
ELE16-02402
| Electrical Rough-In | 10/19/2016 | 10/21/2016 | 10/20/2016 3:51:14 PM | A | CANC |
|
|
Building F Phone #: ###-#### >> Inspection requested via web by Christy Cheney Inspection cancelled from web by: Christy Cheney
|
ELE16-02400
| Electrical Rough-In | 10/19/2016 | 10/21/2016 | 10/20/2016 3:51:00 PM | A | CANC |
|
|
Res. Building A Phone #: ###-#### >> Inspection requested via web by Christy Cheney Inspection cancelled from web by: Christy Cheney
|
ELE16-02399
| Electrical Rough-In | 10/19/2016 | 10/21/2016 | 10/20/2016 3:50:30 PM | A | CANC |
|
|
Building A Phone #: ###-#### >> Inspection requested via web by Christy Cheney Inspection cancelled from web by: Christy Cheney
|