Inspections for the day of: Friday, October 21, 2016.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Page
TitleFIRE INSPECTOR
Phone #208-914-5431
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-02173 FIRE-Final Inspection10/21/201610/21/201610/21/2016 3:13:44 PMPCANC
Inspection request is going to be rescheduled for 24OCT2016.
BLD14-02173 FIRE-Conference10/20/201610/21/201610/21/2016 1:37:43 PMADONE
Fire conference complete, discussed remaining requirements in regards to life safety for TCO.
FIR16-00569 INSP-Sprinkler Rough-in10/21/201610/21/201610/21/2016 1:36:19 PMPPASS
Rough to cover inspection for overhead fire sprinkler on level 6 complete, city approved plans are notated with yellow highlighter, overhead fire sprinkler piping on level 6 approved for cover.
BLD16-03125 FIRE-Final Inspection10/21/201610/21/201610/21/2016 1:34:05 PMPPASS
Final fire sprinkler inspection complete, no modifications to fire alarm, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIR16-00450 INSP-Sprinkler Rough-in10/20/201610/21/201610/21/2016 11:31:13 AMAPASS
Rough to cover/tenting inspection complete for overhead fire sprinkler piping located in attic spaces on levels 2 and 3, overhead fire sprinkler for entire building approved for cover.
FIR16-00576 INSP-Final Inspection10/17/201610/21/201610/21/2016 8:41:38 AMAPASS
Final fire sprinkler inspection passed/complete.