ELE17-02412
| ELE-Aging Inspection | 10/21/2019 | 10/21/2019 | 10/28/2019 6:05:14 AM | | DONE |
|
|
Schedule a final inspection.
|
ELE19-03682
| Electrical Rough-In | 10/21/2019 | 10/21/2019 | 10/21/2019 2:56:24 PM | P | PASS |
|
|
Shaun Phone #: ###-#### Ok cover mstr floor heat
|
ELE19-02313
| Final | 10/21/2019 | 10/21/2019 | 10/21/2019 1:30:53 PM | P | PASS |
|
|
Final for service only. Phone #: ###-#### Inspection requested via web by Garrett Collins Ok final. Intersystem installed, main breaker only, no other breakers.
|
ELE19-01596
| Final | 10/21/2019 | 10/21/2019 | 10/21/2019 12:54:40 PM | P | PASS |
|
|
Lee Phone #: ###-#### Ok final ceiling fan back porch.
|
ELE19-04049
| Permanent Service | 10/21/2019 | 10/21/2019 | 10/21/2019 12:04:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Garrett Collins p/s o/h rec ok
|
ELE19-00005
| Final | 10/21/2019 | 10/21/2019 | 10/21/2019 11:24:38 AM | A | PASS |
|
|
Contact: Paul Wheeler Phone #: ###-#### Inspection requested via web by Deb Gooden Ok final coffee bar in plaza.
|
ELE19-01489
| Electrical Rough-In | 10/18/2019 | 10/21/2019 | 10/21/2019 11:01:42 AM | A | PASS |
|
|
Wall cover in area D. Toby is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Ok cover Area D walls. Highlighted and noted on prints.
|
ELE18-04721
| Final | 10/18/2019 | 10/21/2019 | 10/21/2019 10:15:46 AM | A | PASS |
|
|
Swimming pool electrical final Phone #: ###-#### Inspection requested via web by Lars Johnson Ok final.
|
ELE19-04035
| Permanent Service | 10/18/2019 | 10/21/2019 | 10/21/2019 9:11:28 AM | A | FAIL |
|
|
Keeley Phone #: ###-#### 1. Grounding electrode system needs updated. Minimum #6 copper, and 2 ground rods atleast 6' apart. 2. Left phase conductor in outside disconnect needs checked. Looks like insulation is split before landing in breaker. 3. Bushing needed in top right portion of inside panel.
|