ELE99-03431
| Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 14:34:38. Contact: ###-####. Final ok
|
ELE99-01929
| Final | 10/21/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | P | PASS |
|
|
DAVE ###-#### WORK ###-#### BETWEEN 1:30-2:00 - CALCULATIONS IN YOUR BOX THAT YOU NEEDED P/S O/H ok 2 meters
|
ELE99-03059
| Electrical Rough-In | 10/22/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | P | PART |
|
|
john ###-#### R/I P/S ok reconnect needs bond water and gas.
|
ELE99-03805
| Final | 10/22/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | P | FAIL |
|
|
DON--- ###-#### FN SER UPGRADE Suplimental electrodes 422-13
|
ELE99-03799
| Electrical Rough-In | 10/22/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | P | FAIL |
|
|
UNIT D RON ###-#### REINSPECT Unused openings.
|
ELE99-03398
| Electrical Rough-In | 10/22/1999 | 10/22/1999 | 10/25/1999 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 10/22/1999 at 10:52:23. Contact: ###-####. R/I ok
|
ELE99-02972
| Rough-In Permanent Service | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 22:33:10. Contact: ###-####. Conf. Only
|
ELE99-03780
| Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
PARTIAL R/I WALLS MIKE ###-#### Part ok
|
ELE99-03784
| Permanent Service | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
HERE IS THE RIGHT ADDRESS....NEED TO CHECK THE SERVICE. THANKS No address yet, but all services are ok
|
ELE99-03775
| Temporary Service | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | FAIL |
|
|
DAVE ###-#### TEMP POLE Could not locate address- called and was told that address was wrong and would reschedule.
|
ELE99-01090
| Final | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
HP ###-#### LATE AM Final ok
|
ELE99-03799
| Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | FAIL |
|
|
Approve to cover Alan ###-#### Unused openings Nail Plates
|
ELE99-03734
| Electrical Rough-In | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
matt ###-#### reinspect R/I ok
|
ELE99-03727
| Final | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 15:31:34. Contact: ###-####. Final ok
|
ELE99-03398
| Final | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 15:32:59. Contact: ###-####. Induction.
|