BLD99-02811
| BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PART |
|
|
JIM ###-#### Ok to side, frame ok pending elec.
|
BLD99-02981
| BLD-Footing | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PART |
|
|
jed ###-####-20153 after the beep Ok for ETG's w/2 #4 bars continuous.. Need eng's at "found" (lateral design) per permit.
|
BLD99-01043
| BLD-Footing | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 11:31:09. Contact: ###-####. Need clarify 1hr lid penetrations.
|
BLD99-02317
| BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PART |
|
|
KENT--###-#### RE-BAR Spec. insp. Onsite
|
BLD99-01963
| BLD-Conference | 10/22/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | A | PASS |
|
|
W/cont. ok for T/O W/O all tile at sauna.
|
BLD99-01410
| BLD-Framing/Rough-in | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 10/21/1999 at 12:33:22. Contact: ###-####. Keep C/N- 1st fl. Ext. walls ok per. Eng.
|
BLD99-02369
| BLD-Final | 10/21/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | P | FAIL |
|
|
JOE UNIT 2021 - ###-#### Need fire, HTG, etc. C/N
|
BLD99-01754
| BLD-Final | 10/22/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | P | FAIL |
|
|
GEORGE ###-#### No plan onsite, left msg.
|
MIS99-00210
| BLD-Final | 10/22/1999 | 10/22/1999 | 10/22/1999 12:00:00 AM | P | PART |
|
|
To determine bond amount for demo Bill Gurley space 15 for directions to the location of the demo ###-#### Bond amount per bid.
|